Frame and truss installer terms and conditions in South Australia
Framers stand the house up. Wall frames and roof trusses arrive from a fabricator, and the framer erects them to the layouts, braces and ties them down, and hands the building on to every trade that follows. In South Australia that is building work, done under a licence, and paid under a subcontract and the Security of Payment Act. Talon Legal drafts frame and truss installer terms and conditions, framing subcontracts and payment claim procedures for South Australian framers. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frame and truss installer terms and conditions SA key facts
| Issue | Position for frame and truss installers in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA) and Regulations 2026; Building and Construction Industry Security of Payment Act 2009 (SA); Personal Property Securities Act 2009 (Cth). Current to 22 November 2026. |
| Building work | Constructing or erecting a building, in whole or part (section 3(1)). |
| Licence | A framer that carries on business doing this work for others needs a licence (section 6(1)), and the licence class must cover the building. |
| Subcontracts | A domestic building work contract does not include a subcontract (section 3(1)), so the homeowner rules sit with the builder. |
| Payment claims | Construction work includes prefabrication of components and work rendering a building complete (SOPA section 5(1)(e)); claims under section 13. |
| Six-month limit | A payment claim can be served within the contract's period or six months after the work was last carried out, whichever is later (section 13(4)). |
| Owner builders | A homeowner who engages a framer directly makes a domestic building work contract; the SOPA does not apply where the owner lives there (section 7(2)(b)). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need frame and truss installer terms and conditions? What this guide covers
This guide covers what is particular to frame and truss installer terms and conditions in South Australia, current to 22 November 2026: the licence a framer needs, framing subcontracts with builders, layouts, bracing and site readiness, how frames fix the positions of other trades’ work, payment claims, frames on site before they are stood, and jobs for owner builders.
We act for framing contractors, carpenters who frame, and frame and truss suppliers that offer installation.
Free Consultation. Send us the subcontract your builders ask you to sign and your quote or rate sheet. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Does a framer need a builders licence?
- Framing subcontracts with builders
- Layouts, bracing and site readiness
- Frames decide where other trades go
- Payment claims under the Security of Payment Act
- Frames delivered but not yet stood
- Framing for owner builders
- What the framing pack holds
- How similar matters tend to play out
- Framing case law
- How we build frame and truss installer terms and conditions
- Frequently asked questions
- Related trade contract guides
Does a framer need a builders licence?
Yes, where the framer carries on the business of performing building work for others. Building work is the whole or part of the work of constructing, erecting, altering, adding to or demolishing a building (section 3(1)), and standing and fixing wall frames and roof trusses is part of constructing a building. A person who carries on that business is a building work contractor and must be licensed (sections 3(1), 6(1)).
The licence class matters as much as the licence. In Vizzari, a builder and his company managed the construction of six two-storey units, but their licences permitted single storey buildings only ([7]). They could not sue on the contract and recovered on a quantum meruit instead ([45], [79]). A framer whose licence is limited, whether by storeys, contract value or kind of work, should check each job against it before signing.
| Question | Answer |
|---|---|
| Labour only for a builder? | Still building work; a framing business needs its own licence (an employee carries on no business of their own) |
| Working for a licensed builder? | The framer's own business still needs its own licence |
| Contract price if unlicensed? | Not recoverable, unless a court finds the failure inadvertent only (section 6(2)) |
| Reasonable value of work? | A court can allow it on a quantum meruit (Vizzari [79]) |
Before you sign the next builder’s framing subcontract. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Framing subcontracts with builders
Builders’ subcontract forms are written for the builder. A framer reading one should look for these clauses first.
| Clause | What to look for |
|---|---|
| Scope | Walls, trusses, bracing, tie-downs, fascia, eaves and window installation: which are in, which are out |
| Rates | Per square metre, per lineal metre or per job, and what counts as an extra |
| Waiting time | A rate when frames are late, the slab is not ready or another trade is in the way |
| Defects | Who decides a defect, the time to fix it and the right to inspect before back-charges |
| Set-off and retention | How much can be held, for how long and against what |
| Payment | The reference date for claims, the time for payment and the payment claim process |
| Termination | Notice periods and payment for work done on termination |
A subcontract for domestic building work is not a domestic building work contract (section 3(1)), so the Form 1 notice, the deposit limits and the cooling-off right do not apply to it. The framer’s protection is the subcontract and the Security of Payment Act.
Layouts, bracing and site readiness
Frames and trusses are made to the fabricator’s layouts and the engineer’s design. The framer installs them, and the contract should say which documents govern and who answers for errors in them.
- Documents. The layout drawings, the bracing and tie-down design, and the revision the frames were made to.
- Errors in the design. That the framer installs to the documents supplied and is not responsible for their design, but will notify the builder of anything that appears wrong before installing it.
- Site readiness. A slab or floor that is square, level and set out to the drawings, with access for delivery and a crane where needed.
- Missing or damaged components. Who orders replacements, and the waiting rate while they come.
- Weather and stability. That frames left standing are braced as the design requires, and who pays for re-straightening after storm damage.
- Inspections. That the builder arranges any inspection the job requires, and the framer is paid for returns to fix items that were not in its scope.
Frames decide where other trades go
Truss and stud positions fix where skylights, downlights, ducts and services can go. A framer should not be blamed for the consequences of the design it was given, and its paperwork should show what that design was.
In WCK, the certified plans located skylights in positions that were not central to each room, to suit the layout of the roof trusses ([315]). The owner’s expert said ceiling diffusers were relocated because of truss positions, and that this is not unusual ([318]). Judge Millsteed said it is obvious that the location of the diffusers would be determined by the layout of the roof trusses ([319]), and found the changes were minor alterations that did not need approval on the evidence ([321]). The owner’s cross-claim succeeded only for $599 ([441]).
For a framer, two lessons:
- Keep the layouts. The truss layout as supplied, and any changes requested on site, recorded with who asked.
- Raise clashes early. Write to the builder when a service, skylight or opening cannot go where the drawings show because of a truss or stud, before the next trade arrives.
Payment claims under the Security of Payment Act
Construction work includes the construction of buildings and any operation that forms an integral part of, or is preparatory to or is for rendering complete, that work, including the prefabrication of components (section 5(1)(a), (e)). Materials and components to form part of a building are related goods (section 6(1)(a)(i)). A framer working under a construction contract is entitled to progress payments.
| Step | Rule |
|---|---|
| Payment claim | Identifies the work, states the claimed amount and says it is made under the Act (section 13(2)) |
| Time | Within the contract's period, or six months after the work was last carried out, whichever is later (section 13(4)) |
| One claim per reference date | Section 13(5), though earlier unpaid amounts can be included (section 13(6)) |
| Payment schedule | The builder replies within the contract's time or 15 business days, whichever expires earlier, or becomes liable for the claimed amount (section 14(4)) |
A framer working for a homeowner who lives, or will live, in the house cannot use the Act against that homeowner (section 7(2)(b)). On a builder’s job, the Act runs against the builder.
When a builder will not pay the framing claim. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frames delivered but not yet stood
A framer that supplies frames as well as installing them owns goods on someone else’s land until they are fixed. The Personal Property Securities Act applies to security interests in personal property, but it does not apply to an interest in fixtures (sections 8(1)(j), 10). Once frames are fixed to the building, a retention of title clause in them has little left to bite on.
- Before fixing. A retention of title clause, registered where the Act requires, protects frames on site.
- After fixing. The protection is payment terms, the Security of Payment Act and, on a homeowner job, the contract.
- Delivery. Who bears the risk of theft and weather once frames are delivered.
Framing for owner builders
An owner who engages a framer directly, without a head builder, makes a domestic building work contract with the framer. That brings in the homeowner rules once the price reaches $20,000: a written contract with Form 1, a fixed price, a deposit of no more than 5%, and the cooling-off right (sections 28 to 30, 36). Under $20,000 the work is minor domestic building work and Division 1 does not apply (section 27(2)). The statutory warranties apply either way (section 32(2)).
The framer also takes on matters a builder would otherwise handle: the documents, the site, and whether development approval and building indemnity insurance are needed (sections 33(2), 34). The contract should say who obtains approvals and that the owner provides a site set out to the approved drawings.
What the framing pack holds
A framing pack is built from our masters and a frame and truss schedule, and quoted as a fixed fee before we start. It holds the frame and truss installer terms and conditions a framer needs for builders, suppliers and owner builders.
- A framing subcontract for work for builders, with rates, waiting time, defects and set-off terms that a framer can sign.
- A schedule of the clauses to check in a builder’s own subcontract.
- A payment claim and payment schedule procedure under the Security of Payment Act.
- Supply terms with retention of title for frames supplied before installation.
- A homeowner contract and minor works terms for owner builder jobs.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
The slab that was out. A framer arrives to find the slab out of square. The subcontract has a site readiness clause and a waiting rate, so the delay and the extra packing are claimed as variations.
The back-charge for the skylights. A builder deducts the cost of moving downlights from the framer’s claim. The truss layout shows the positions were set by the fabricator’s design, and the framer had written about the clash before the electrician arrived.
The claim that ran out of time. A framer finishes a job and chases payment informally for eight months. The six-month period under section 13(4) has passed unless the contract allows longer.
Framing case law
None of the decisions below concerned a framer’s own subcontract. One shows how roof truss layouts fix where other work goes, and the other what follows when a licence does not cover the building.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| WCK Pty Ltd v Fowler [2016] SADC 142 | District Court | Skylight and diffuser positions set by the roof truss layout; the owner's complaints largely failed | [315], [318] to [321], [441] |
| Vizzari Builders Pty Ltd v Misale [2011] SADC 86 | District Court | Licences limited to single storey did not cover two-storey units; recovery on a quantum meruit, not the contract | [7], [45], [73], [78], [79], [175] to [178] |
Case notes
WCK Pty Ltd v Fowler [2016] SADC 142
A builder sued an owner for unpaid variations, and the owner cross-claimed for damages. The certified plans placed skylights in positions not central to each room, to suit the layout of the roof trusses ([315]). The owner’s expert said ceiling diffusers had been relocated because of truss positions, and that this is not unusual ([318]). Judge Millsteed said it is obvious that the location of the diffusers would be determined by the truss layout ([319]), found no evidence they were installed away from the certified plans ([320]), and accepted that the changes were minor and needed no approval ([321]). Judgment was entered for the builder for $15,691.50 including interest, with $599 to the owner set off ([441]).
Vizzari Builders Pty Ltd v Misale [2011] SADC 86
A builder agreed to manage the construction of six two-storey units at Hindmarsh Island on what the parties called a cost plus arrangement ([4], [5]). The signed document did not satisfy the Building Work Contractors Act, and the builder’s licences permitted single storey buildings only ([7]); the document had no description of the works and no completion date ([73]). Judge Clayton set out section 6(2) and held the builder could recover on a quantum meruit ([78], [79]), including project management fees and subcontractor and supplier costs ([45]). The owners’ cross-claim for defects was dismissed, the lien could not be maintained, and judgment was entered for the builder for $112,730.74, with $6,261.10 to the owners for a bank guarantee ([175] to [178]).
How we build frame and truss installer terms and conditions
We start with how you work: labour only or supply and install, for builders or owner builders, houses or commercial jobs.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licence, crews, rates, suppliers and clients | We map your jobs to subcontracts, supply terms and homeowner contracts |
| 2. Review | The subcontracts your builders use and your own quote or rate sheet | We mark the set-off, defects, waiting time and payment terms that cost you money |
| 3. Drafting | Masters and the frame and truss schedule | We draft your subcontract, supply terms and the payment claim procedure |
| 4. Delivery | Word documents and a claim template | We walk you through serving a payment claim and reading a payment schedule |
We cannot promise that terms prevent every dispute. A framer with the layouts on file, the clashes in writing and a payment claim served on time is in a strong position when one starts.
Frequently asked questions
Are free frame and truss installer terms and conditions enough in SA?
Not on its own. A template from a builder or another state will not deal with South Australian licensing, the six-month limit for payment claims, or retention of title for frames before they are fixed (Building Work Contractors Act section 6; Security of Payment Act section 13(4); Personal Property Securities Act section 8(1)(j)).
Do frame and truss installers need a licence in SA?
Yes, if they carry on the business of framing for others. Erecting frames and trusses is part of constructing a building (Building Work Contractors Act sections 3(1), 6(1)).
Can an unlicensed framer be paid?
Not the contract price, unless a court finds the failure was inadvertent only (section 6(2)). A court can allow a reasonable sum for the work on a quantum meruit, as in Vizzari.
Can a framer serve a payment claim on a builder?
Yes. Construction work includes building and the operations that render it complete, and prefabricated components are included (Security of Payment Act section 5(1)(a), (e)).
How long does a framer have to serve a payment claim?
Within the period in the contract or six months after the work was last carried out, whichever is later (section 13(4)).
What happens if the builder does not reply to a payment claim?
If no payment schedule is given within the contract’s time or 15 business days, whichever expires earlier, the builder becomes liable for the claimed amount (section 14(4)).
Who is responsible for errors in truss layouts?
The contract should say. A framer that installs to the fabricator’s layouts and the engineer’s design should state that it is not responsible for their design and will notify apparent errors before installing.
Can a framer keep title to frames until paid?
Until they are fixed. The Personal Property Securities Act does not apply to an interest in fixtures (sections 8(1)(j), 10), so retention of title protects frames on site but not frames in the building.
Does the Security of Payment Act apply to owner builder jobs?
Not where the owner lives, or proposes to live, in the house (section 7(2)(b)). The framer relies on the contract.
Do I need a lawyer for frame and truss installer terms and conditions?
The law does not require one, but framers sign builders’ forms and wait for builders’ payments. We draft frame and truss installer terms and conditions for South Australian framers that hold the line on rates, waiting time and payment.