Domestic Building Work Contracts SA: Section 28, Form 1, Price Rules and Cooling-Off
Domestic building work contracts in South Australia
A domestic building work contract is a contract with a building owner for building work on a house. Once the cost to the owner reaches $20,000, Part 5 of the Building Work Contractors Act 1995 (SA) decides its form: written, every term set out, the contractor’s licence details, both signatures, a fixed or properly marked price, and Form 1 given to the owner with a signed copy. Talon Legal drafts and reviews domestic building work contracts for South Australian builders and trades. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Domestic building work contract key facts
| Issue | Position in South Australia |
|---|---|
| Governing law | Part 5 of the Building Work Contractors Act 1995 (SA) and Part 4 and Schedule 2 of the Building Work Contractors Regulations 2026. Current to 20 November 2026. |
| What it is | A contract between a building work contractor and another person for domestic building work, including any variation of it, but not a subcontract (section 3). |
| Domestic building work | Constructing, erecting, underpinning, altering, repairing, improving, adding to or demolishing a house, site work for it, and the prescribed classes, including any building work within the curtilage of a house (section 3; regulation 4(2)). |
| When the formal rules apply | When the work is not minor domestic building work: for contracts made on or after 10 November 2025, a cost to the owner of $20,000 or more (sections 3 and 27(2); regulation 4(4)(c)). |
| What it must contain | Writing, all the terms, the licensed business name and licence number, any contents the regulations require, both signatures, and a signed copy given to the owner with Form 1 (section 28(1)). |
| Price | A specific fixed price and the terms of payment, unless a lawful rise-and-fall, cost-plus or GST clause applies, with "This Price May Change" or "Estimate Only" beside or below the affected price (section 29). |
| Cost-plus margin | The actual cost of specified materials or work plus up to 15% (section 29(5)(a); regulation 19(1)). |
| Deposit | Not more than 5% of the price where the price is $20,000 or more (section 30(4)(d)(ii)). |
| Cooling-off | Notice before the end of five clear business days after the contract is made, or before completion if the contract rules or insurance rules were not complied with (section 36(3), (5)). |
| Harsh terms | A court can avoid or modify a harsh or unconscionable term and order repayment (section 38). |
| Contracting out | Any exclusion, limitation, modification or waiver of a right or warranty under the Act is void (section 42). |
| Penalties | Up to $50,000 for an individual and $250,000 for a company for a breach of section 28 or 29; expiation fee $5,000 (sections 28(2), 29(9)). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need a domestic building contract in SA? What this guide covers
This guide sets out what South Australian law requires of a domestic building work contract, current to 20 November 2026. It is part of our trade contracts SA guides. Jobs under $20,000 are covered in minor domestic building work, and the payment, variation, warranty and licence rules in deposits and progress payments, variations, statutory warranties and defects and builder’s licences.
We draft these contracts for builders, renovators and the trades whose homeowner jobs fall inside the Act, including plumbers, electricians, solar installers, pool builders, landscapers and painters.
Free Consultation. Send us the contract you give owners, and the way you give them Form 1, before your next signing. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- What is a domestic building work contract?
- Which contracts must meet the formal rules?
- What must the contract contain?
- What is Form 1 and when must it be given?
- How must the price be stated?
- Charging clauses and pool contracts
- Can the owner cancel? The cooling-off right
- Can a builder contract out of the Act?
- What if a term is harsh or unconscionable?
- What happens if a contract does not comply?
- How similar matters tend to play out
- How we prepare domestic building contracts
- Domestic building contract case law
- Frequently asked questions
- Related trade contract guides
What is a domestic building work contract?
Section 3 of the Building Work Contractors Act 1995 (SA) defines a domestic building work contract as a contract between a building work contractor and another person for the performance by the contractor of domestic building work, including any variation of the contract. A subcontract for the performance of domestic building work is excluded. The other party is the building owner: the person for whom the work is, or is to be, performed.
Domestic building work is the whole or part of the work of constructing, erecting, underpinning, altering, repairing, improving, adding to or demolishing a house, the work of excavating or filling a site for that work, and work of a prescribed class. A house is a building intended for occupation as a place of residence. Regulation 4(3) of the Building Work Contractors Regulations 2026 takes hotels, motels, youth hostels, residential camps, boarding and lodging houses, designated rooming houses, university halls of residence, boarding school dormitories, barracks, nurses homes and residential facilities for workers or training out of the definition.
Regulation 4(2) adds the work that turns many trade jobs into domestic building work:
| Prescribed domestic building work (regulation 4(2)) | Typical trades |
|---|---|
| (a) Construction, alteration, repair or improvement of a swimming pool or spa within the external walls of a house, within its curtilage or on the boundary of the curtilage | Pool and spa builders |
| (b) Any other building work carried out within the curtilage of a house or on the boundary of the curtilage | Landscapers, pavers, fencers, pergola, deck and shed builders |
| (c) Installation, maintenance, repair and removal of insulation | Insulation installers |
| (d) Painting a house or part of a house | Painters |
| (e) Installation of air-conditioning in relation to a house | Air-conditioning installers |
| (f) Installation of solar panels in relation to a house | Solar installers |
| (g) Plumbing, gas fitting and electrical work in relation to a house | Plumbers, gasfitters, electricians |
Calling the document something else does not change its character. In Forlyle Pty Ltd v Tiver [2007] SASC 464, a “development agreement” under which a company agreed to have a house built for the owners, and subcontracted the building to a licensed builder, was a domestic building work contract, and the statutory warranties were implied into it ([3]).
Splitting a job does not change it either. For Part 5, where a contractor and a person make an arrangement for domestic building work at a site to be performed in stages under separate contracts, those contracts are taken to be a single domestic building work contract (section 3(2)).
Which contracts must meet the formal rules?
The formal rules are in Division 1 of Part 5: section 28 (form), section 29 (price), section 30 (payments) and section 31 (exhibition houses). Division 1 does not apply to a contract for minor domestic building work (section 27(2)). Some contracts are also exempted by regulation.
| Contract | Division 1 (sections 28 to 31) | Source |
|---|---|---|
| Domestic building work at a cost to the owner of $20,000 or more, contract made on or after 10 November 2025 | Applies | Sections 3, 27(2); regulation 4(4)(c) |
| Domestic building work at a cost under $20,000, contract made on or after 10 November 2025 | Does not apply; the warranties in section 32 still do | Section 27(2) |
| Contract made from 15 October 2001 to 9 November 2025 | Applies from $12,000 | Regulation 4(4)(b) |
| Contract for domestic building work consisting solely of demolition | Divisions 1, 3 and 4 do not apply | Regulation 5(8) |
| Building owner is a public company, or a subsidiary of one | Sections 28, 29 and 30 and Division 4 do not apply | Regulation 5(10)(b) |
| Work performed as a contractor for the South Australian Housing Trust or its Minister | Sections 28, 29 and 30 and Division 4 do not apply | Regulation 5(10)(a) |
| Subcontract to a builder | Not a domestic building work contract | Section 3 |
What must the contract contain?
Section 28(1) lists seven requirements. They apply together, and a failure to meet any one of them is an offence by the building work contractor (section 28(2)).
| Requirement (section 28(1)) | What it means in practice |
|---|---|
| (a) In writing | A quote accepted by text message or a handshake does not meet it. |
| (b) Sets out in full all the contractual terms | Plans, specifications and general conditions belong in or attached to the signed document. Terms kept only on a website or in a later email are a risk under this paragraph. |
| (c) The name in which the contractor carries on business under its licence, its licence number, and the names and licence numbers of any partners | The licensed entity, not a trading name that has not been notified, and its own licence number. |
| (d) Any contents required by the regulations | A charging clause needs the regulation 16 statements; a pool or spa contract made on or after 1 September 2026 needs pool safety information (regulation 17). |
| (e) Signed by the contractor and the building owner, personally or by an authorised agent | Both signatures, on the same terms. |
| (f) The owner is given a copy of the signed contract as soon as reasonably practicable after both have signed, with the prescribed notice | Form 1, delivered with the signed copy. |
| (g) The copy and the notice are readily legible, apart from signatures and initials | No faded scans or unreadable phone photos. |
The maximum penalty under section 28(2) is $50,000 for an individual and $250,000 for a company, and the offence can be expiated for $5,000.
What is Form 1 and when must it be given?
Form 1 is the notice in Schedule 2 of the Regulations titled “Your building contract: your rights and obligations”. It is the prescribed notice that section 28(1)(f) requires the owner to receive with a copy of the signed contract. It explains, in plain terms, the cooling-off right, price changes, prime cost items, provisional sums, charging clauses, the statutory warranties, building indemnity insurance, deposits, progress payments and disputes.
Regulation 18 controls how it is given. The form must be completed as the form requires, must not contain any particulars or statements other than those the Act or Regulations require, must be printed or typed in type no smaller than 10 point Times New Roman, and must not include printing or handwriting, other than a signature, that is not clear and legible. A builder’s own summary of owners’ rights, however accurate, is not Form 1, and adding marketing material to the form is contrary to regulation 18(2)(b).
Timing matters for a reason beyond the offence. If Form 1 is never given, section 28 has not been complied with, and the owner’s right to terminate under section 36 runs until the building work is completed rather than for five business days.
How must the price be stated?
The starting point is section 29(1): the contract must stipulate a specific price for the work that is fixed and not subject to change, and the terms of payment. The rest of section 29 sets out the only ways that price can move.
| Clause | When it is lawful | What the contract must show |
|---|---|---|
| Rise-and-fall clause (price moves with labour and materials costs) | Only if the contract stipulates a completion period (section 29(2)). It stops applying to work done after that period unless the contract provides for extension, the delay was the owner's fault or beyond the contractor's control and unforeseeable, the contractor gave written notice of the extension and its cause as soon as reasonably practicable, and the work was completed as soon as reasonably practicable (section 29(3), (4)). | "This Price May Change" beside or below the price (section 29(6)) |
| Cost-plus clause (actual cost of specified materials or work plus a margin) | For materials and work specified in the contract, plus an additional amount of not more than 15% of the cost (section 29(5)(a); regulation 19(1)) | "Estimate Only" or "This Price May Change", as the case requires, and a fair and reasonable estimate (section 29(6), (8)) |
| Hourly rate | Where the contract specifies an hourly rate, the amount found by applying it to the work actually performed (section 29(5)(b); regulation 19(2)) | The rate, and the marking in section 29(6) |
| GST clause | Not in a fixed price contract made on or after 1 July 2000 (section 29(8a)) | A prominent statement that the price will increase to cover GST (section 29(8b)) |
Where more than one price may change or is an estimate, those prices must be set out in a single list in the contract (section 29(7)). A breach of any requirement of section 29 is an offence with the same maximum penalties as section 28 (section 29(9)).
Charging clauses and pool contracts
Regulation 16 applies to a charging clause, meaning a clause that gives the contractor a legal right to lodge a caveat over the property where it is working. A contract with one must state four things: that the clause seeks to establish an interest in the property for which a right to lodge a caveat will exist; that a caveat will restrict the owner’s rights to deal with the property and have dealings registered in the Lands Titles Office; that the interest entitles the contractor to apply to a court for the sale of the property to recover a debt under the contract; and that the owner is advised to get independent legal advice about the clause.
Regulation 17 is new with the 2026 Regulations. A domestic building work contract entered into on or after 1 September 2026 that is for, or includes, building, altering, repairing or improving a swimming pool or spa within the external walls or curtilage of a house, or on the boundary of the curtilage, must include information about the safety requirements for swimming pools under the Planning, Development and Infrastructure (Swimming Pool Safety) Regulations 2019. Both regulations are made for section 28(1)(d), so leaving the information out is a section 28 breach.
Can the owner cancel? The cooling-off right
Section 36 lets a building owner end a domestic building work contract without giving a reason. The owner must give the contractor a signed written notice, served personally or posted by certified mail, of the owner’s intention not to be bound, and the contract is taken to be terminated when the notice is served or posted (section 36(3)).
The deadline is the “prescribed time” in section 36(5): the end of five clear business days after the contract is made, or, if there has been a failure to comply with any requirement of Division 1 or Division 3 in relation to the contract, the time the building work is completed. A missing Form 1, a contract that omits the licence number, a deposit above the limit or work started without required insurance each leaves the contract open to cancellation until completion.
After a termination, the Magistrates Court can order the return of the whole or part of what the owner paid, or payment to the contractor for materials supplied and work or services performed (section 36(4)). The right does not apply to minor domestic building work (section 36(2)), and the Regulations remove it for demolition-only contracts and for public company owners (regulation 5(8), (10)(b)).
Can a builder contract out of the Act?
No. Section 42 makes void any purported exclusion, limitation, modification or waiver of a right conferred, or a contractual condition or warranty implied, by the Act. A clause that shortens the warranty period, caps liability for statutory warranty claims or has the owner waive the cooling-off right does not bind the owner.
Section 42 reaches beyond the contract itself. In Forlyle Pty Ltd v Tiver the Full Court held that a settlement in which owners released all claims “known or unknown” was, so far as it compromised claims for future defects, an exclusion, limitation, modification or waiver of the statutory warranties and void ([19]). The words “or unknown” were severed and the rest of the settlement was enforced ([24]).
What if a term is harsh or unconscionable?
Under section 38, a party to a domestic building work contract may apply to the Magistrates Court for relief if a term or condition is harsh or unconscionable, or is such that a court of Equity would give relief. Relief can also be granted by any court hearing proceedings to enforce the contract or to recover damages or compensation for its breach (section 38(3)).
The court may avoid the term from the start, modify the terms of the contract as it considers just, and order repayment to the owner of an amount paid under a term it has avoided or modified (section 38(4)). The power survives discharge of the contract (section 38(5)), and a person who shared in the profits of the transaction can be joined and made subject to orders (section 38(6)). Section 38 is not limited to contracts of $20,000 or more.
What happens if a contract does not comply?
The Act states the consequences of a non-compliant contract in its offence and termination provisions. It does not say that a contract which breaches section 28 is void.
| Failure | Consequence | Provision |
|---|---|---|
| Any section 28 requirement not met | Offence by the contractor: up to $50,000 or $250,000; expiation $5,000 | Section 28(2) |
| Price not stated as section 29 requires | Offence: up to $50,000 or $250,000; expiation $5,000 | Section 29(9) |
| Deposit or payment demanded beyond what section 30 allows | Offence: up to $100,000 or $500,000 | Section 30(1), (2a) |
| Any Division 1 or Division 3 requirement not met | The owner can cancel until the work is completed | Section 36(5)(b) |
| A clause excluding or limiting rights or warranties under the Act | Void | Section 42 |
Section 54 gives a defence to any offence against the Act if the defendant proves the offence was not committed intentionally and did not result from a failure to take reasonable care to avoid it. Prosecutions happen. In Commissioner for Consumer Affairs v Brittain [2007] SASC 381 an unlicensed handyman had quoted $27,000 for a driveway and carport, the neighbour accepted orally and there was no written contract; he was convicted on his pleas of guilty of offences that included the section 28 contract requirements and the section 30 payment rule ([2], [5]).
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Each depends on its own contract and facts.
A $46,000 bathroom and laundry renovation. The builder’s contract is signed at the kitchen table and work starts the next week, but Form 1 was never handed over. The owner falls out with the builder at the waterproofing stage and serves a signed notice by certified mail. Because section 28(1)(f) was not complied with, the cooling-off period had not ended, and the contract is terminated; the argument moves to what the Magistrates Court should order under section 36(4).
A $28,000 ducted air-conditioning install. The installer’s quote says “price subject to change if ductwork is not accessible”. That is not a rise-and-fall, cost-plus, hourly rate or GST clause, so it sits outside the only ways section 29 lets a price move, and a breach of section 29 is an offence (section 29(9)). A cost-plus item for the uncertain ductwork, marked “Estimate Only” and listed with any other variable prices, would have done the same job lawfully.
A builder’s standard terms with a 12-month warranty limit. A clause says all warranty claims must be made within 12 months of handover. Section 42 makes it void so far as it limits the statutory warranties, and the owner keeps the five years in section 32(5).
How we prepare domestic building contracts
We draft domestic building work contracts that meet sections 28 to 30 on their face, so the formalities are done by the document rather than by memory on site.
| Stage | What happens | What we do |
|---|---|---|
| 1. Review | You send your current contract, quote form and signing process | We check them against sections 28 to 30, regulations 16 to 19 and Form 1 |
| 2. Structure | We settle fixed price, cost-plus and provisional sum items for your trade | We set out the pricing so the section 29 markings and single list are built in |
| 3. Drafting | The contract, schedules and signing pack are written | We draft from our South Australian precedents and the current law |
| 4. Signing process | The steps for signatures, the signed copy and Form 1 are fixed | We write the checklist your team uses at every signing |
| 5. Updates | The law or your work changes | We revise the contract and the checklist |
We cannot promise that a contract prevents every dispute. A compliant contract removes the cooling-off and offence risks, and it decides most price arguments before they start.
Before your next signing. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Domestic building contract case law
These are the South Australian decisions this guide relies on. The case notes state what each court decided.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Forlyle Pty Ltd v Tiver [2007] SASC 464 | Supreme Court (Full Court) | A development agreement to build a house was a domestic building work contract; a release of future defect claims is void under section 42 | [3], [19], [24] |
| Commissioner for Consumer Affairs v Brittain [2007] SASC 381 | Supreme Court | Convictions for unlicensed work, contract requirements, unauthorised payments and no insurance; penalty appeal dismissed | [2], [5], [21], [22] |
| Howland v Michalski [2004] SADC 71 | District Court | Section 28 applied because the price exceeded the sum prescribed at the contract date; progress payments are repayable only through section 38 relief or a section 36 termination | [19], [30] |
Case notes
Forlyle Pty Ltd v Tiver [2007] SASC 464
The Full Court agreed with the trial judge that a development agreement under which a company was to have a house built for the owners was a domestic building work contract, so the section 32 warranties were implied into it ([3]). It then held that the parties’ later settlement, so far as it released claims for defects not yet known, was void under section 42 ([19]), and that the words “or unknown” could be severed ([24]).
Commissioner for Consumer Affairs v Brittain [2007] SASC 381
The respondent was convicted on his pleas of guilty of carrying on business without a licence, failing to comply with the requirements for a domestic building work contract, performing building work without insurance and demanding an unauthorised payment ([2]), after a $27,000 driveway and carport job accepted orally with no written contract ([5]). Gray J held the Magistrate’s single $2,500 fine was not shown to be manifestly inadequate and dismissed the Commissioner’s appeal ([21], [22]). The maximum penalties now in sections 6, 28 and 30 are far higher than those that applied to that 2004 offending.
Howland v Michalski [2004] SADC 71
On review of a minor civil action, the District Court agreed that the work was domestic building work and, because the contract predated 15 October 2001 and exceeded the $5,000 sum then prescribed, that section 28 applied ([19]). It observed that a builder who has received progress payments under the contract is not required, and cannot be ordered, to repay them unless a court finds a term harsh or unconscionable under section 38 or the owner has terminated under section 36 ([30]).
Frequently asked questions
What is a domestic building work contract in SA?
It is a contract between a building work contractor and another person for domestic building work, including any variation of the contract (section 3 of the Building Work Contractors Act 1995). Domestic building work is work on a house and the prescribed classes, such as pools, insulation, painting, air-conditioning, solar panels, and plumbing, gas and electrical work. A subcontract is not one.
What must be included in a building contract in SA?
For domestic building work of $20,000 or more: the contract must be in writing, set out all its terms, state the contractor’s licensed name and licence number, include any contents the regulations require, be signed by both parties, and be given to the owner as a signed copy with Form 1 (section 28(1)).
What is Form 1 for a building contract in SA?
Form 1 is the prescribed notice “Your building contract: your rights and obligations” in Schedule 2 of the Building Work Contractors Regulations 2026. It must be given to the owner with a copy of the signed contract as soon as reasonably practicable after both parties sign (section 28(1)(f)).
Is there a cooling-off period for building contracts in SA?
Yes, for domestic building work that is not minor. The owner can terminate by signed written notice, served personally or by certified mail, before the end of five clear business days after the contract is made, or before completion if Division 1 or Division 3 of Part 5 was not complied with (section 36).
Can a builder change the price after signing in SA?
Only through a lawful rise-and-fall clause, a cost-plus clause for specified items, an hourly rate clause or a GST clause, each marked as section 29 requires, or through an agreed variation. The starting point in section 29(1) is a fixed price that is not subject to change.
Does a renovation contract need to comply with the Building Work Contractors Act?
Yes, if the renovation is domestic building work and the cost is $20,000 or more for a contract made on or after 10 November 2025. Altering, repairing or improving a house is domestic building work under section 3.
Are building contracts under $20,000 covered?
They are minor domestic building work, so sections 28 to 31, the insurance rules and the cooling-off right do not apply. The section 32 warranties, section 38 relief and the section 42 bar on contracting out still apply.
Is a building contract void if it does not comply with section 28?
The Act does not say so. Section 28(2) makes non-compliance an offence by the contractor, and section 36(5)(b) extends the owner’s right to terminate until completion. Whether the contract can still be enforced in a particular case is a question for advice on its facts.
Can a builder include a caveat clause in a home building contract?
Yes, but a charging clause, meaning a clause giving the contractor a right to lodge a caveat, must be accompanied by the four statements in regulation 16, including that the owner is advised to get independent legal advice.
Do I need a lawyer to draft a domestic building contract?
The law does not require one. We draft and review these contracts so the section 28 formalities, the section 29 price rules and Form 1 are built into the document and the signing process, which is where most compliance failures happen.