Painter Terms and Conditions SA: Painting Contracts and Quotes
Painter terms and conditions in South Australia
Painting a building is building work in South Australia because the Regulations say so. A painting business needs a building work contractors licence, its contracts with homeowners are governed by Part 5 of the Building Work Contractors Act 1995 (SA), and an exterior repaint of $20,000 or more needs the same written contract and Form 1 as a renovation. Talon Legal drafts terms, contracts and subcontracts for South Australian painters and decorators. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Painter terms and conditions SA key facts
| Issue | Position for painters in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA) and Regulations 2026; Security of Payment Act 2009 (SA); Australian Consumer Law. Current to 20 November 2026. |
| Building work | Painting a building or part of a building is prescribed building work (regulation 4(1)(e)); painting a house is domestic building work (regulation 4(2)(d)). |
| Licence | A building work contractors licence for a business that paints for others (section 6(1)), which may be limited to painting or to subcontract work (section 7). |
| Advertising | Advertisements must show the licensed name and licence number (section 50). |
| Under $20,000 | Minor domestic building work for contracts made on or after 10 November 2025: no Form 1, deposit cap or cooling-off, but the statutory warranties apply (sections 27(2), 32). |
| $20,000 or more | A written contract with the licence details, signed by both parties and given with Form 1 (section 28); a deposit of not more than 5% (section 30). |
| Warranties | Proper work to accepted trade standards, good and proper materials supplied by the painter, and fitness for a purpose the owner made known (section 32(2)). |
| Written warranties | A written workmanship warranty given to a consumer must comply with regulation 90 of the Competition and Consumer Regulations 2010 (Australian Consumer Law section 102). |
| Strata and commercial | Painting and decorating is construction work under the Security of Payment Act (section 5(1)); unfair contract terms rules apply to small business clients. |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need painter terms and conditions? What this guide covers
This guide covers what is particular to painter terms and conditions in South Australia, current to 20 November 2026: why the building work rules apply to painters, the contract each kind of painting job needs, the clauses painting terms should carry, what decides a painting dispute and how painters get paid. The law painters share with carpenters, tilers and the other finishing trades is in the finishing trades contracts SA guide, and the building contract rules for every trade are in trade contracts SA.
We act for residential repaint businesses, new home painters working for builders, and commercial and strata painting contractors.
Free Consultation. Send us your quote template and terms. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Why painting is building work, and the licence it needs
- Which contract fits which painting job?
- The clauses that matter in painter terms and conditions
- What decides a painting dispute?
- Getting paid for painting
- What the painter pack holds
- How similar matters tend to play out
- How we build painter terms and conditions
- Frequently asked questions
- Related trade contract guides
Why painting is building work, and the licence it needs
Painting is not named in the Act’s own definition of building work, which speaks of constructing, altering, repairing and improving buildings (section 3). The Regulations put it there directly: painting a building or part of a building is a prescribed class of building work (regulation 4(1)(e)), and painting a house is domestic building work (regulation 4(2)(d)).
Two consequences follow for every painting business.
- A licence. A business that paints for others is carrying on business as a building work contractor and needs a building work contractors licence (section 6(1)), with a registered building work supervisor (section 12). The maximum fine for an individual without a licence is $100,000 for a first or second offence; for a company, $500,000. An unlicensed painter is not entitled to any fee or other consideration under or in relation to the contract unless a court finds the failure resulted from inadvertence only (section 6(2)).
- The homeowner contract rules. A painter’s contract with a homeowner is a domestic building work contract, with the statutory warranties at any price and the full section 28 regime at $20,000 or more.
A painting licence may carry conditions limiting it to painting, or to subcontract work for licensed builders (section 7; Schedule 1 Part 3 of the Regulations). Work beyond those conditions is outside the licence: replacing rotten weatherboards, rebuilding fascias or repairing render before painting is building work of another kind. The business must also advertise in its licensed name or a notified registered business name with its licence number (sections 49, 50).
Which contract fits which painting job?
| Painting job | Rules that govern it | Document |
|---|---|---|
| Interior repaint, touch-ups or a feature wall, under $20,000 | Minor domestic building work for contracts made on or after 10 November 2025; statutory warranties apply | Small job agreement with a written quote |
| Exterior repaint of $20,000 or more for an owner-occupier | Division 1 of Part 5: section 28 contract and Form 1, price rules, deposit cap, progress payments for work done, cooling-off | Domestic building work contract |
| Repaint for a landlord or investor | Domestic building work; the Security of Payment Act can apply too, because its exclusion covers only premises the owner lives in (section 7(2)(b)) | Domestic building work contract with payment terms that work under both Acts |
| New home painting for a builder | A subcontract (section 3); the Security of Payment Act | Painting subcontract with stage claims, retention and defects terms |
| Strata or body corporate repaint | Painting a residential building can be domestic building work, so Part 5 is checked first; the Security of Payment Act can apply because the contracting party does not live in the premises (section 7(2)(b)) | Painting contract chosen after that check |
| Commercial and industrial painting | Not domestic building work; the Security of Payment Act | Commercial terms or subcontract |
Strata work needs care. Part 5 is not confined to detached houses: the Regulations exempt multi-storey residential buildings from Division 3, the insurance rules, and not from the rest of Part 5 (regulation 5(9)(a)). Whether a strata repaint is domestic building work turns on the building and the contracting party; that is a reading of the definitions, not a decided point.
The clauses that matter in painter terms and conditions
| Clause | Why it matters for painters |
|---|---|
| Surface preparation | Preparation decides how long paint lasts and is where quotes are cut. The terms should describe the preparation included, what is excluded, and how extra preparation found on the job is priced. |
| Product, colours and coats | Name the product system, the number of coats and the colours, with a colour sign-off before work starts. A clause letting the painter change the product without agreement is a listed example of a possibly unfair term (Australian Consumer Law section 25(g)); allow equivalent products with notice. |
| Existing coatings | Older homes can have coatings that need testing or special handling. The terms should say whether testing and handling are in the price. |
| Repairs before painting | Filling, sanding and minor patching are painting preparation. Carpentry, render and fascia repairs are other building work, so the terms should exclude them unless the business's licence covers them. |
| Weather and access | Exterior work stops for rain, wind and heat. The terms should allow for weather delays and say who provides scaffolding or access equipment and safe access. |
| Furniture and protection | Who moves furniture, what is covered, and who is responsible for fittings removed and replaced. |
| Inspection and touch-ups | A walk-through at completion with a touch-up list closes the job. Without it, the date of completion and the final payment are both open to argument. |
| Variations | Extra rooms, colour changes and extra coats are variations. On a section 28 contract they should be written, priced and signed (section 3). |
| Deposits and progress payments | On homeowner jobs of $20,000 or more, not more than 5% deposit and progress payments only for work already performed (section 30). |
| Warranties | Statutory warranties cannot be excluded (section 42). Paint manufacturers' warranties have their own conditions. A painter's own written warranty given to a consumer, such as a five or seven year workmanship warranty, must comply with regulation 90 of the Competition and Consumer Regulations 2010. |
| Licence details | On homeowner jobs of $20,000 or more, the licensed name and licence number must be in the contract (section 28(1)(c)). |
What decides a painting dispute?
Peeling, flaking and blistering. Paint failure can come from preparation, the product, moisture in the substrate or conditions at the time of application. The painter warrants that the work is done in a proper manner to accepted trade standards and that the materials it supplies are good and proper (section 32(2)(a), (b)). The scope of preparation in the contract, and a record of the conditions, are the painter’s best evidence.
The owner’s choices. An owner who insists on painting over a surface the painter advised should first be repaired, or on a product unsuited to the surface, leaves the painter with a defence to a later warranty claim about the resulting failure, but only if the advice was in writing (section 32(7)).
Colour and finish. Disputes about colour, sheen and coverage turn on what was agreed. A colour sign-off and a named product and number of coats settle those questions before the brushes come out.
Purpose made known. If an owner made known the purpose of the work, for example a coating to stop water getting into a masonry wall, and relied on the painter’s skill, the work must be reasonably fit for that purpose (section 32(2)(f)). Painters should be careful about promising results a coating cannot deliver.
The statutory warranties and defects guide explains the warranties and the five year limit.
Getting paid for painting
- Homeowners, $20,000 or more. A deposit of not more than 5%, then progress payments only for work already performed, each requested by written notice (section 30). The deposits and progress payments guide explains the rules.
- Homeowners, under $20,000. The terms decide, for example a materials deposit and payment on completion after the walk-through.
- Builders. A painting subcontract carries Security of Payment Act rights: payment claims that identify the work, state the amount and say they are made under the Act (section 13(2)), a payment schedule within the contract time or 15 business days (section 14(4)), and no pay when paid (section 12).
- Strata and commercial. The same Security of Payment Act rights for construction work, with account terms, interest and suspension rights in the contract.
What the painter pack holds
A painter pack is built from our masters and a painting trade schedule, and quoted as a fixed fee before we start.
- A small job agreement for homeowner work under $20,000, and a domestic building work contract with Form 1 for repaints of $20,000 or more.
- A painting subcontract for builders, with stage claims, retention and defects terms.
- A strata and commercial painting contract, with the Part 5 check built in.
- A colour and product sign-off, a completion walk-through form, a written advice form and a variation form.
- A painting trade schedule: scope wording for interior and exterior work, preparation levels, product and coat specifications, exclusions for repairs, and warranty wording that meets regulation 90.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
An $8,500 interior repaint. The job is minor domestic building work, so there is no Form 1, deposit cap or cooling-off, but the statutory warranties apply. A colour sign-off before work starts and a walk-through at the end are what decide a later complaint about colour or coverage.
A $26,000 exterior repaint for an owner-occupier. Painting a house is domestic building work, and at $26,000 Division 1 applies: a written contract with the licence details and both signatures, Form 1, a deposit of not more than $1,300, and progress payments only for work already done. The owner can cool off within five clear business days.
A repaint where the weatherboards are rotten. The painter’s licence is limited to painting. Replacing the boards is building work outside it, so the terms exclude it and the painter gives written advice that the boards should be replaced before painting. If the owner insists on painting over them, the written advice is the painter’s defence when the paint fails.
How we build painter terms and conditions
We start with your work: interior or exterior, homeowner, builder or strata, the price range of your jobs and the warranty you advertise.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licence, job mix, preparation standards and warranty offer | We map each job type against your licence, the $20,000 line and the Security of Payment Act |
| 2. Review | Your quotes, terms, warranty certificate and any builder or strata contracts | We mark what fails section 28, section 30, regulation 90 or the unfair terms rules |
| 3. Drafting | Masters and the painting trade schedule | We draft for your work and your licence conditions |
| 4. Delivery | Word documents, sign-off and walk-through forms | We explain Form 1, variations and payment claims for your office |
We cannot promise that terms prevent every dispute. Terms that record preparation, product and colour answer the questions a painting dispute turns on.
Before your next exterior repaint. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Do painters need a builders licence in SA?
Yes, if they carry on business painting for others. Painting a building is prescribed building work (regulation 4(1)(e)), so a painting business is a building work contractor and needs a licence under section 6(1). The licence may be limited to painting.
Is painting a house domestic building work?
Yes. Painting a house is domestic building work (regulation 4(2)(d)), so Part 5 of the Building Work Contractors Act governs a painter’s contract with a homeowner, including the statutory warranties.
Does a painting job over $20,000 need Form 1?
Yes, if it is domestic building work. A contract costing the owner $20,000 or more, made on or after 10 November 2025, must be in writing, set out all its terms, state the licence details, be signed by both parties and be given to the owner with Form 1 (section 28).
How much deposit can a painter take?
On a homeowner job of $20,000 or more, not more than 5% of the contract price (section 30(4)(d)(ii)). Jobs under $20,000 are minor domestic building work and the section 30 limits do not apply to them.
Who is responsible if paint peels or blisters?
It depends on the cause. On a homeowner job the painter warrants proper work to accepted trade standards and good and proper materials it supplies (section 32(2)(a), (b)). Failure caused by a surface the owner refused to have repaired against the painter’s written advice is a defence (section 32(7)).
Can a painter charge for extra preparation?
Yes, if the contract allows it. The terms should describe the preparation included and price extra preparation as a variation or at a stated rate. On a section 28 contract, any amount that may change needs “Estimate Only” or “This Price May Change” beside it (section 29(6)).
Do painters have to show their licence number in ads?
Yes. A licensed building work contractor’s advertisements must show its licensed or notified business name and its licence number (section 50), with exceptions for job advertisements and advertisements to other contractors.
Does the Security of Payment Act apply to painting?
Yes, to painting under construction contracts, because painting and decorating is construction work (section 5(1)). It does not apply to domestic building work on premises the owner lives in or proposes to live in (section 7(2)(b)).
Can a painter offer a seven year workmanship warranty?
Yes, but a written warranty against defects given to a consumer must comply with regulation 90 of the Competition and Consumer Regulations 2010, including the prescribed text about consumer guarantees (Australian Consumer Law section 102). It adds to the statutory warranties and cannot reduce them.
Do I need a lawyer for painter terms and conditions?
The law does not require one, but generic painting templates do not deal with the licence, Form 1 or regulation 90. We draft painter terms and conditions for South Australian painting businesses that fit your work, your licence and your warranty offer.
Related trade contract guides
Related guides
- Finishing trades contracts SA
- Carpenter terms and conditions SA
- Tiler terms and conditions SA
- Trade contracts SA
- Domestic building work contracts
- Minor domestic building work under $20,000
- Building deposits and progress payments
- Variations to a building contract
- Statutory warranties and defects
- Builders licence SA
- Subcontractor agreements