Fencer Terms and Conditions SA: Fencing Contracts and the Fences Act
Fencer terms and conditions in South Australia
A dividing fence in South Australia is a cost the Fences Act 1975 shares between two neighbours. The fencer’s contract is with whoever hires it, and the Act says nothing about the fencer’s right to be paid. Fencing other than post and wire is also building work, so the fencer needs a builders licence. Talon Legal drafts fencer terms and conditions, fencing contracts and subcontracts for South Australian fencing contractors, from residential boundary fencing to commercial and pool fencing. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Fencer terms and conditions SA key facts
| Issue | Position for fencers in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA) and Regulations 2026; Fences Act 1975 (SA); Building and Construction Industry Security of Payment Act 2009 (SA). Current to 21 November 2026. |
| Fencing as building work | Fencing, excluding post and wire fencing, is building work (regulation 4(1)(c)), so carrying on a fencing business needs a builders licence (section 6(1)). |
| At a house | Fencing within the curtilage of a house or on its boundary is domestic building work (regulation 4(2)(b)). |
| Neighbours | A dividing fence is a fence dividing the contiguous land of adjoining owners; the Fences Act sets how they share the cost, through notices and, if they disagree, the Magistrates Court (Fences Act sections 4, 5, 12). |
| Who pays what | Absent agreement, the neighbour's share is one-half of the minimum cost of an adequate fence (section 12(7)). |
| Approvals | Fences up to 2.1 m are excluded from development unless an exception applies; masonry fences over 1 m and pool safety fences are among the exceptions (Planning, Development and Infrastructure (General) Regulations 2017 Schedule 4 clause 4(1)(d)). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need fencer terms and conditions? What this guide covers
This guide covers what is particular to fencer terms and conditions in South Australia, current to 21 November 2026: the licence, the Fences Act process between neighbours and where the fencer fits in it, who the fencer’s client is, approvals, footings and boundaries, and getting paid. The rules all outdoor trades share are in the landscaping and pool contracts SA guide.
We act for residential fencing contractors, pool fence installers, commercial fencing businesses and the gate and screen businesses that work beside them.
Free Consultation. Send us your quote form and the notice you give clients for their neighbours. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- The licence and the homeowner rules
- The Fences Act process and the fencer
- Who is the fencer's client?
- Approvals, height and masonry
- Boundaries, footings and old fences
- Commercial and subcontract fencing
- What the fencing pack holds
- How similar matters tend to play out
- Fencing case law
- How we build fencer terms and conditions
- Frequently asked questions
- Related trade contract guides
The licence and the homeowner rules
Regulation 4(1)(c) of the Building Work Contractors Regulations 2026 makes fencing, excluding post and wire fencing, building work. A person who carries on the business of performing building work for others needs a licence (section 6(1)). Specialist contractors can hold a licence limited to specified kinds of work (Schedule 1 Part 3 clause 3(d)), and work outside those kinds is unlicensed work. An unlicensed contractor is not entitled to any fee or other consideration under or in relation to the contract, unless a court is satisfied the failure resulted from inadvertence only (section 6(2)).
Post and wire fencing sits outside the class, so a rural fencer building only post and wire fences works under the contract and consumer law, not the Act.
| Job at a house | Rules that apply |
|---|---|
| Fence under $20,000 | Minor domestic building work: the statutory warranties in section 32 apply; Division 1 does not (section 27(2); regulation 4(4)) |
| Fence of $20,000 or more | The Division 1 contract: in writing, every term, licence details, signatures and Form 1 (section 28); a deposit of no more than 5% (section 30(4)); five clear business days to cool off (section 36) |
| Building indemnity insurance | Only where the fence needs development approval and the contract is $20,000 or more (section 33(2)) |
A fence under $20,000 is minor work. A long front fence in masonry, or a fence combined with a retaining wall, can take a job over the line. Variations count, because a domestic building work contract includes any variation (section 3).
The Fences Act process and the fencer
The Fences Act 1975 sets the rights between neighbours. It names the fencer in the notice, but gives the fencer no right to be paid.
| Step | What the Act says |
|---|---|
| Notice | An owner who proposes a new dividing fence may serve a notice in Form 1 stating the length, position and nature of the fence, an estimate of the cost, the amount sought from the neighbour, and "the name and address of any contractor or other person by whom the proposed fence is to be erected" (section 5(1), (2)) |
| Repairs | Replacement, repair or maintenance work uses Form 2, which also names the contractor (section 5(3), (4)) |
| Objection | The neighbour has thirty days to serve a cross-notice objecting or making counter-proposals (section 6); silence is deemed agreement (section 7) |
| Starting work | The owner may proceed after thirty days if no cross-notice is served, or once agreement is reached or the court decides (section 8(1)) |
| Starting early | "No contribution shall be recoverable" for fencing work performed before the owner is entitled to proceed, except as the Act otherwise provides (section 8(2)) |
| Urgent repairs | Where a dividing fence is damaged and there is an urgent need to repair it, either owner may do the work without notice and recover the lesser of half the cost and the share of a replacement (section 16(1)) |
| Entry | Two days written notice before entering the neighbour's land, except in an emergency (section 18) |
| Service | A notice is signed by the owner or the owner's solicitor, attorney or agent, and served personally or by registered post (section 19) |
Section 8(2) is where fencers get hurt. If the fence goes up before the thirty days have run, the client may be unable to recover half the cost from the neighbour, and a client who cannot recover half is a client who disputes the invoice. The terms should say that the fencer starts only when the client confirms the notice period has run, or the neighbour has agreed in writing.
Who is the fencer’s client?
The Fences Act decides what each neighbour owes the other. On a reading of that Act, it does not make the neighbour liable to the fencer: the fencer is paid under its own contract, by whoever signed it.
- One neighbour engages the fencer. The contract is with that neighbour, for the whole price. The neighbour’s contribution is the client’s to recover, not the fencer’s.
- Both neighbours engage the fencer. Say so, have both sign, and state each one’s share and when each pays. Two invoices avoid one owner paying for the other.
- A neighbour refuses to pay. The client can apply to the Magistrates Court for an order for the contribution (section 12(4), (5)); the fencer’s claim is still against its client.
- Notices. A fencer can prepare and serve the notice as the client’s agent (section 19(1)), but the terms should say that the client gives the information and stands behind it.
Approvals, height and masonry
| Fence | Planning position (Schedule 4 clause 4(1)(d)) |
|---|---|
| Up to 2.1 m, ordinary materials | Excluded from development, unless an exception applies |
| Masonry, or with masonry piers, over 1 m | Not excluded |
| Safety fence for a pool approved, or requiring approval, on or after 1 July 1993 | Not excluded |
| Over 1 m within 6 m of a corner where two road boundaries meet, without a 4 x 4 m cut-off | Not excluded |
| Road boundary or front fences in the Historic Area Overlay | Not excluded |
| Brush fence closer than 3 m to a house or unit (a Class 1 or 2 building) | Not excluded |
Privacy screening attached to a fence counts as part of the fence (clause 4(13)(c)). A retaining wall holding back more than 1 m of ground is not excluded either (clause 4(1)(f)), which matters when a fence sits on a wall.
Where approval is needed, the terms should say who applies and pays, and that work starts only once approval is granted. Pool fences also carry a statutory deadline for the pool builder, covered in the pool builder terms and conditions SA guide.
Boundaries, footings and old fences
- The line. A dividing fence need not sit exactly on the boundary (see Kitson, below), but a fence on the wrong line can be ordered removed (Fences Act section 12(2)(h)). A survey is a cost of fencing work the neighbours can share (section 4(1)).
- Footings. Specify post spacing, depth and concrete. In Roennfeldt, below, a new boundary fence leaned because of defective footings that the Magistrate found were a contractor’s responsibility.
- Services. Post holes can be shafts under the Work Health and Safety Regulations 2012, on a reading of regulation 5, so a person with management or control of the site must take all reasonable steps to obtain underground essential services information before digging (regulation 304(2)).
- Old fences. Say who removes and disposes of the old fence, and what happens if it contains asbestos.
- Gardens and structures. Say who moves plants, sheds and pavers along the line, and what the fencer is not responsible for.
Commercial and subcontract fencing
Erecting, maintaining or dismantling fences is construction work under the Security of Payment Act (section 5(1)(a), (e)(iii)). A fencer working for a builder, a developer or a business can serve payment claims that identify the work, state the amount and say they are made under the Act (section 13(2)). A builder that does not give a payment schedule in time becomes liable for the claimed amount (section 14(4)).
The Act does not apply to a contract for domestic building work on premises the owner lives in or proposes to live in (section 7(2)(b)). A homeowner fence is paid under the contract, and a fence for a landlord can come within the Act.
What the fencing pack holds
A fencing pack is built from our masters and a fencing schedule, and quoted as a fixed fee before we start.
- Homeowner terms for fences under $20,000, and a domestic building work contract with Form 1 for larger jobs.
- A one-neighbour and a two-neighbour version, with each owner’s share and payment terms.
- A Fences Act notice checklist and a start condition tied to the thirty-day period.
- Commercial and subcontract terms with payment claim and payment schedule procedures.
- Schedules for post spacing and footings, old fence removal, gates and screens.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
The fence built in week two. A client books the fencer for the day after the notice was served. The neighbour objects within the thirty days and refuses to pay. The client cannot recover half under the Act and short-pays the fencer. Terms that made the start date depend on the notice period would have kept the fencer out of it.
The two invoices. Two neighbours agree to share a new steel fence. The fencer has both sign, invoices each for half, and is paid by both.
The masonry front fence. A client wants a 1.5 m rendered masonry fence on the front boundary. The fencer’s terms put approval on the client and made the start date depend on it.
Fencing case law
None of the decisions below concerned a fencer’s own contract. Both are disputes between neighbours under the Fences Act, and each turned on a point a fencer’s terms should anticipate.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Roennfeldt v Wyness [2022] SASC 95 | Supreme Court | A new boundary fence failed on a contractor's defective footings; the Court applied the equal benefit presumption and the adequate fence rules and ordered the cheaper remediation | [10], [60], [61], [69], [153], [154] |
| Kitson v Lim & Liu [2024] SADC 134 | District Court | A dividing fence need not be right on the boundary; survey costs were reasonably required for the fencing work | [24], [59], [102] |
Case notes
Roennfeldt v Wyness [2022] SASC 95
Two neighbours agreed in 2015 to a new steel boundary fence ([6]). It later deflected, and the Magistrate found that a contractor was responsible for the defective footings and that neither neighbour knew of the defect ([9], [10]). On appeal, Parker J set out the presumption that adjoining owners benefit equally (section 12(6)) and the meaning of an adequate fence (section 12(8)(a)) ([60], [61]). His Honour explained that section 12(7) stops a court making the owners pay for a better than adequate fence where that costs more than a new adequate fence, so a cheaper rectification can be ordered ([69]). The Court found that underpinning the existing fence was possible and preferable, and ordered the fence remediated to the engineer’s scope ([153], [154]).
Kitson v Lim & Liu [2024] SADC 134
Owners of adjoining lots in a community plan disputed whether a structure the applicant removed was a dividing fence ([1], [17], [18]). Chief Judge Evans said that a dividing fence must divide the contiguous land of adjoining owners but need not be right on the boundary ([24]), and was satisfied the structure was a dividing fence ([59]). The respondents had served a notice of intention under the Act before starting proceedings ([66]). The Court accepted that a survey was reasonably required for the fencing work, and found the ancillary costs of $3,463 fair and reasonable ([102]).
How we build fencer terms and conditions
We start with how you quote and build: who you contract with, how neighbours pay, and what you dig and remove.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licence, fence types, neighbour arrangements and commercial work | We sort your jobs into minor work, Division 1 contracts and subcontracts |
| 2. Review | Your quotes, terms, notices and invoices | We mark start dates, payment terms and responsibilities that leave you exposed |
| 3. Drafting | Masters and the fencing schedule | We draft one-neighbour and two-neighbour terms, a contract for larger jobs and subcontract terms |
| 4. Delivery | Word documents ready for quoting | We brief your office on notices, start conditions and approvals |
We cannot promise that terms prevent every dispute. Terms that follow how neighbours share a fence decide most of them before they start.
Before your next fencing quote goes out. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Do fencing contractors need to be licensed in South Australia?
Yes, for fencing other than post and wire fencing. That fencing is building work under the Building Work Contractors Regulations 2026 (regulation 4(1)(c)), and carrying on the business needs a licence (Building Work Contractors Act 1995 section 6(1)).
Does a fencer need a written contract?
For a fence at a house costing $20,000 or more, yes: a contract that meets section 28 of the Building Work Contractors Act 1995, given with Form 1. Under $20,000 the statutory warranties still apply (section 32).
Who pays for a dividing fence in SA?
The adjoining owners, in shares the Fences Act 1975 sets. Absent agreement, the neighbour’s share is one-half of the minimum cost of an adequate fence (section 12(7)), and the owners are presumed to benefit equally (section 12(6)).
Can a neighbour be made to pay the fencer?
Not under the Fences Act. On a reading of that Act, it governs what each neighbour owes the other; the fencer is paid by whoever signed its contract. Both neighbours can sign if both are to pay.
How long must an owner wait before building a dividing fence?
Thirty days after serving the notice, unless the neighbour agrees sooner or the court decides (Fences Act section 8(1)). Work done before then may leave no contribution recoverable (section 8(2)).
Can a dividing fence be fixed without notice?
Where the fence is damaged and there is an urgent need to repair it, either owner may do the work without notice and recover the lesser of half the cost and the share of a replacement (Fences Act section 16(1)).
Does a fence need council approval in SA?
A fence up to 2.1 m is excluded from development unless an exception applies. Masonry fences over 1 m, pool safety fences and some front fences are exceptions (Planning, Development and Infrastructure (General) Regulations 2017 Schedule 4 clause 4(1)(d)).
What is an adequate fence?
A fence that conforms with general standards of good fencing in the locality and is adequate for the purposes of the owner asked to contribute (Fences Act section 12(8)(a)).
Can a fencer make a payment claim for commercial work?
Yes. Erecting fences is construction work (Security of Payment Act section 5(1)(a), (e)(iii)), so a fencer working for a builder or business can serve a claim that meets section 13(2). A contract for domestic building work on a home the client lives in, or proposes to live in, is excluded (section 7(2)(b)).
Do I need a lawyer for fencer terms and conditions?
The law does not require one, but a fencer’s terms join the builders licence rules with a neighbours’ Act that does not protect the fencer. We draft fencer terms and conditions for South Australian fencing businesses that close that gap.
Related trade contract guides
Related guides
- Landscaping and pool contracts SA
- Pool builder terms and conditions SA
- Landscaper terms and conditions SA
- Paver terms and conditions SA
- Minor domestic building work under $20,000