Concrete and Masonry Contracts SA: Concreters, Bricklayers, Retaining Walls and Underpinning
Contracts for concrete and masonry trades in South Australia
Concreters, bricklayers, retaining wall builders and underpinning contractors build the parts of a job everything else stands on, and the Building Work Contractors Act 1995 (SA) treats that work as building work. Footings, slabs, walls and underpinning carry the licence, the homeowner contract rules and, for approved jobs of $20,000 or more, building indemnity insurance. Excavation near a boundary brings in the neighbour. Talon Legal drafts concrete and masonry contracts, terms and conditions and subcontracts for South Australian concreters, bricklayers, retaining wall builders and underpinning contractors. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Concrete and masonry contracts SA key facts
| Issue | Position in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA) and Regulations 2026; Planning, Development and Infrastructure Act 2016 (SA) and its General Regulations 2017; Work Health and Safety Regulations 2012 (SA); Local Government Act 1999 (SA); Building and Construction Industry Security of Payment Act 2009 (SA); Australian Consumer Law. Current to 21 November 2026. |
| Building work | Constructing, underpinning, altering or repairing a building, and excavating or filling a site for that work; a building includes a wall or structure (section 3). Paving is building work too (regulation 4(1)(b)). |
| At a house | Building work within the curtilage of a house or on its boundary is domestic building work (regulation 4(2)(b)). |
| Licence | Needed to carry on a business of performing building work for others (section 6(1)); a licence can be limited to specified building work (Schedule 1 Part 3 clause 3(d)). |
| Homeowner contracts | Division 1 of Part 5 applies at $20,000 or more for contracts made on or after 10 November 2025 (sections 3, 27(2); regulation 4(4)). |
| Excavation near a boundary | Where an approval envisages access to neighbouring land to deal with an effect on its stability, the neighbour must be given a notice in the prescribed form at least 20 business days before the work starts (Planning, Development and Infrastructure Act section 139; General Regulations regulation 64). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need concrete and masonry contracts? What this guide covers
This guide sets out the law that concrete and masonry contracts in South Australia work within, current to 21 November 2026, for the trades that build footings, slabs, walls and foundations. It covers which work is building work, licences, and homeowner contracts and approvals. It also covers excavation next to a neighbour, the safety rules that change how a job is planned, council crossovers and payment claims. The trade guides deal with what is particular to each trade: concreter terms and conditions, decorative concreter terms and conditions, retaining wall builder terms and conditions, bricklayer terms and conditions and underpinning contractor terms and conditions.
It sits under our trade contracts SA guide. The topic guides go deeper on domestic building work contracts, statutory warranties and defects and the builders licence.
Free Consultation. Send us the quote, contract or subcontract you use now. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Which concrete and masonry work is building work?
- Licences for structural trades
- Homeowner jobs, approvals and insurance
- Excavation next to a neighbour
- Safety rules that shape the contract
- Driveways and the council crossover
- Payment claims and subcontracts
- Trades in this family
- How similar matters tend to play out
- What the pack adds for structural trades
- Concrete and masonry case law
- How we build concrete and masonry contracts
- Frequently asked questions
- Related guides
Which concrete and masonry work is building work?
The Building Work Contractors Act defines building work by what is done to a building, and a building includes a wall or structure (section 3). That brings most structural trades inside the Act.
| Work | Status under the Building Work Contractors Act | Source |
|---|---|---|
| Footings and slabs for a building | Building work: constructing a building | Section 3 |
| Excavating or filling a site for building work | Building work | Section 3 |
| Brick and block walls, including garden and boundary walls | Building work: a building includes a wall | Section 3 |
| Retaining walls | Building work: a wall or structure | Section 3 |
| Underpinning | Building work: underpinning is named in the definition | Section 3 |
| Paving, including concrete paths and patios | Building work | Regulation 4(1)(b) |
| Any of the above within the curtilage of a house or on its boundary | Domestic building work | Regulation 4(2)(b) |
| The same work for a builder | A subcontract, not a domestic building work contract | Section 3 |
On a reading of regulation 4(1)(b), a concrete driveway or path is paving. The decorative concreter guide deals with driveways in detail.
Licences for structural trades
Carrying on a business of performing building work for others needs a licence (section 6(1)). A licence can be limited to specified building work (Schedule 1 Part 3 clause 3(d)). Some limited licences cover only subcontract work for a licensed contractor, or work on a project a licensed contractor organises or supervises (clause 3(d)(ii)). In Howland v Michalski [2004] SADC 71, a contractor’s licence was certified for “footing construction” and “concrete floor paving” ([20]). On the evidence, the Magistrate could not tell whether it covered the retaining wall and slab the contractor had agreed to build ([23]).
An unlicensed contractor risks its fee unless a court finds the failure resulted from inadvertence only (section 6(2)). The point for a structural business is the edge of its licence. A concreter that starts building block retaining walls, or a bricklayer that takes on underpinning, should check the licence covers the new work before quoting it.
Homeowner jobs, approvals and insurance
| Question | Rule | Source |
|---|---|---|
| Is the job minor domestic building work? | Yes if the cost to the owner is under $20,000 (contracts made on or after 10 November 2025) | Section 3; regulation 4(4) |
| What applies to minor work? | The statutory warranties; not Division 1, insurance or cooling-off | Sections 27(2), 32, 33(2), 36(2) |
| What applies at $20,000 or more? | A written contract with every term, licence details, signatures and Form 1; a fixed price; a deposit of no more than 5%; cooling-off | Sections 28, 29, 30(4), 36 |
| When is insurance needed? | Only where the work needs development approval and is not minor work | Sections 33(2), 34 |
| Does a variation count? | Yes: a domestic building work contract includes variations | Section 3 |
Approval decides insurance, so the contract should say who confirms whether the work needs development approval. Some small structural work is declared not to be development. One example is a retaining wall retaining a difference in ground levels of no more than 1 metre, outside designated flood areas and more than 100 metres from the coast (General Regulations Schedule 4 clause 4(1)(f)). A masonry fence over 1 metre is outside the fence exclusion (clause 4(1)(d)). Work that needs approval and is not minor work must have a building indemnity insurance policy in force, and the owner given the certificate, before the work is performed (section 34).
The statutory warranties apply to every domestic building work contract, whatever the price (section 32(2)). They cover proper work to accepted trade standards and the agreed plans and specifications, good and proper materials and compliance with the law. Where the owner relies on the contractor’s skill, they also cover fitness for a purpose made known. Proceedings on a warranty must be brought within five years after completion (section 32(5)).
Excavation next to a neighbour
Concrete and masonry work digs, fills and builds close to boundaries. Two parts of the Planning, Development and Infrastructure Act 2016 deal with the neighbour.
Work that affects the stability of other land (section 139). The section applies where a development approval envisages that the person undertaking the development will need access to other land to deal with an effect on its stability. That person must give the owner of the affected site a notice in the prescribed form. It may then gain access at any reasonable time to protect the site, after giving notice of the proposed work (section 139(2)). The General Regulations prescribe work that is to be treated as affecting the stability of other land for that section:
| Prescribed work | Source |
|---|---|
| An excavation that intersects a plane sloping down at 1 vertical to 2 horizontal from a point 600 mm below natural ground level at the boundary | Regulation 64(2)(a) |
| An excavation that intersects a plane sloping down at the same slope from any boundary between two other sites within twice the depth of the excavation | Regulation 64(2)(b) |
| Fill within 600 mm of an adjoining site, other than fill of no more than 200 mm for gardening or similar purposes | Regulation 64(2)(c) |
The notice must be served at least 20 business days before the building work starts (regulation 64(2a)). At least 1 business day’s notice must be given before access (regulation 64(2b)). The neighbour may require the building owner to shore up any excavation, or to underpin, stabilise or otherwise strengthen the foundations of any building, to the extent its professional engineer specifies (regulation 64(3)). The building owner pays the reasonable cost of that engineer’s report, plans and specifications (regulation 64(4)). Failing to give the access notice, or to do the work the neighbour can require, is an offence with a maximum penalty of $10,000 (section 139(4)).
Access for other building work (section 140). A person who reasonably needs access from an adjoining allotment to carry out building work can serve a notice in the prescribed form. If there is no response within 10 business days, or access is refused, the Environment, Resources and Development Court can authorise access on conditions (section 140(2) to (5); regulation 64A(2)). The person entering must pay reasonable compensation for loss or damage it causes (section 140(10)).
The contract should say who serves the notices, who engages the engineers, and who pays for work the neighbour requires. In Bijok, below, a builder excavating next door was found solely liable for subsidence on the neighbours’ land. It had used a retaining system other than the one the engineers designed.
Safety rules that shape the contract
The Work Health and Safety Regulations 2012 set duties that change what a structural job costs and how long it takes. Several kinds of work common to this family are high risk construction work:
| Work | Source |
|---|---|
| Work with a risk of a person falling more than 2 metres | Regulation 291(a) |
| Structural alterations or repairs that require temporary support to prevent collapse | Regulation 291(e) |
| Work in or near a trench or shaft deeper than 1.5 metres | Regulation 291(g) |
| Tilt-up or precast concrete | Regulation 291(m) |
| Work in an area with movement of powered mobile plant | Regulation 291(o) |
A business carrying out high risk construction work must have a safe work method statement prepared before the work starts (regulation 299(1)). For a trench at least 1.5 metres deep, the business must, so far as is reasonably practicable, secure the work area from unauthorised access (regulation 306(1)). It must also minimise the risk of collapse by shoring, benching or battering, unless a geotechnical engineer advises in writing that all sides are safe (regulation 306(3), (4)). Before excavation starts, the person with management or control of the workplace must take all reasonable steps to obtain current underground essential services information (regulation 304(2)).
The contract should price those steps and say who provides the engineer’s advice, the services information and any temporary propping.
Driveways and the council crossover
A driveway crossover built in the street to give access to a property alters the public road. A person other than the council must not make an alteration to a public road unless the council authorises it, on a maximum penalty of $5,000 (Local Government Act 1999 section 221(1)). Altering a road to permit or facilitate access from an adjacent property is an alteration (section 221(2)(a)). Terms for driveway work should say who applies for the authorisation, who pays the council’s charges and what happens if the council requires a different crossover.
Payment claims and subcontracts
Structural trades work for builders as well as owners. Construction work under the Security of Payment Act includes excavation, the laying of foundations and the erection of scaffolding (section 5(1)(e)(i) to (iii)).
- Payment claims. A claim must identify the work, state the amount and say it is made under the Act (section 13(2)).
- Payment schedules. A respondent that does not give a schedule within the contract time, or 15 business days if earlier, becomes liable for the claimed amount (section 14(4)).
- Pay when paid. A clause making payment depend on the head contractor being paid has no effect (section 12).
- Homeowners. The Act does not apply to domestic building work on premises the owner lives in or proposes to live in (section 7(2)(b)).
A subcontract is not a domestic building work contract (section 3), so the Part 5 formalities do not govern it. The subcontract terms decide variations, back charges and notice. In Contek, below, the Court measured a concreting subcontractor’s extra concrete by the delivery dockets, less the volume shown on the drawings.
Trades in this family
The positions below state where the Acts put each trade. Individual businesses differ with the licence they hold and the work they take on.
| Trade | Typical work | Position | Guide |
|---|---|---|---|
| Concreter | Footings, slabs, structural concrete | Building work (section 3); foundations are construction work (Security of Payment Act section 5(1)(e)(ii)) | Concreter terms and conditions |
| Driveway and decorative concreter | Driveways, paths, coloured and exposed finishes | Paving is building work (regulation 4(1)(b)); a crossover needs council authorisation (Local Government Act section 221) | Decorative concreter terms and conditions |
| Retaining wall builder | Sleeper, block and concrete walls | Building work (section 3); a wall retaining more than 1 metre of ground is outside the clause 4(1)(f) exclusion | Retaining wall builder terms and conditions |
| Bricklayer and blocklayer | Brick veneer, double brick, block walls | Building work (section 3); work for a builder is a subcontract | Bricklayer terms and conditions |
| Underpinning contractor | Underpinning, restumping, re-levelling | Building work (section 3); the neighbour rules in section 139 and regulation 64 | Underpinning contractor terms and conditions |
| Formworker and steel fixer | Formwork, reinforcement | Work for a builder is a subcontract (section 3) and construction work under the Security of Payment Act | This guide |
| Stonemason | Natural stone walls and facades | Building work where it forms a wall or structure (section 3) | This guide |
| Scaffolder | Scaffold for structural work | Erecting scaffolding is construction work (Security of Payment Act section 5(1)(e)(iii)); falls over 2 metres are high risk construction work | This guide |
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
The garage slab next to the boundary. A concreter quotes $24,000 for a garage slab with a footing beam along the side boundary at a house. The job is domestic building work over $20,000, so it needs a Division 1 contract with Form 1. The footing excavation intersects the prescribed plane from the boundary, and the approval envisages access to the neighbour’s land. The neighbour’s notice has to be served 20 business days before work starts. Building the start date around that notice keeps the timetable honest.
The wall that grew. A retaining wall quoted at 900 mm becomes 1.4 metres once the levels are set out on site. A wall retaining that much ground is outside the clause 4(1)(f) exclusion. The variation takes the contract price over $20,000, and the contractor stops to confirm approval and insurance before building it.
The bricklayer’s progress claim. A bricklaying subcontractor serves a payment claim on a builder for a completed lift of brickwork, stating that it is made under the Security of Payment Act. The builder gives no payment schedule within 15 business days and becomes liable for the claimed amount (section 14(4)).
What the pack adds for structural trades
Every structural pack starts from our South Australian masters. For concrete and masonry trades we build in what this family needs.
- Homeowner terms for minor work and a domestic building work contract with Form 1 for larger jobs.
- An approvals and engineering checklist tied to the insurance question.
- A neighbour notice and access clause that follows section 139 and regulation 64.
- A site conditions clause for rock, fill, water and services, with priced extras.
- A subcontract with payment claim and payment schedule procedures, variation directions and back charge notices.
The pack is quoted as a fixed fee before we start.
Concrete and masonry case law
Each decision below turned on its own contract and facts. Together they show the points structural trades meet in court.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Sunlight Nominees Pty Ltd v Zotti & Zotti [2017] SASC 176 | Supreme Court | An agreed concrete strength was a term of the contract; the owners were awarded the cost of replacing the driveway, set off against the unpaid price | [22], [74], [111], [123], [125] |
| Bijok v SJ Weir Pty Ltd [2011] SADC 20 | District Court | A builder excavating next door, using a retaining system other than the engineers' design, was liable in negligence for the neighbours' subsidence | [2], [7], [38], [45], [46], [63] |
| Contek Pty Ltd v Mossop Group Pty Ltd [2024] SADC 1 | District Court | A concreting subcontractor's extra concrete was measured by the delivery dockets less the volume on the drawings; a notice clause was not a bar | [63], [279], [330] |
| Ong v Adelaide Retaining Walls [2022] SASC 37 | Supreme Court | A retaining wall contractor was entitled to payment at practical completion despite minor defects | [142], [143], [180] |
| Vettese v Kemp [2000] SASC 154 | Supreme Court (Full Court) | Vendors who built a house owed its buyers a duty of care, breached by the failure to construct a proper retaining wall | [1], [56], [57], [81], [94] |
| Manolakis v Galaxy Homes Pty Ltd [2003] SADC 80 | District Court | Mortar that did not meet the specified Australian Standard justified the cost of rebuilding the brickwork | [10], [75], [93], [146] |
| Kennett Pty Ltd v Janssen [2014] SASC 164 | Supreme Court | A bricklaying subcontractor that suspended work and set conditions for its return repudiated the subcontract | [4], [155], [259] |
Case notes
Sunlight Nominees Pty Ltd v Zotti & Zotti [2017] SASC 176
A concreting business laid a driveway of about 490 square metres at a Yatala Vale property ([1], [9], [12]). It charged $57,933.13, which the owners did not pay ([1]). The owners said it had been agreed that 25 MPa concrete would be used; the contractor used 20 MPa. The Magistrate accepted the owners’ evidence, found the strength was a term of the contract and found a breach ([22]). Doyle J found a sound basis for that conclusion in the timing and context of the specification, given as the work was expanded beyond the written quote ([74]). His Honour found no error in awarding the cost of rectifying the work to the contract ([111]). The cross-appeal was allowed, the owners’ damages were set at $65,000, and judgment was entered for the owners for $7,066.87 ([123], [125]).
Bijok v SJ Weir Pty Ltd [2011] SADC 20
A builder excavating along a boundary for a basement ramp needed a temporary retaining structure to stop soil moving from under the neighbours’ land. The wall it built proved inadequate; soil escaped and the neighbours’ carport, driveway and house were damaged ([7]). The engineers’ design for that section included propping, and the builder used an unpropped method designed for another section ([38]). Judge Boylan found that the builder, as occupier, owed the neighbours a duty to take reasonable care that its excavation did not cause foreseeable damage ([45]). It breached that duty by using a retaining system other than the one the engineers designed ([46]). The builder was found solely liable ([2]), and damages were assessed at $141,952 ([63]).
How we build concrete and masonry contracts
We start with how your structural business works: what you build, who designs it, who you work for, and the licence you hold.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licence, job mix, engineering and clients | We map your work against Part 5, the approval exclusions, the neighbour rules and the safety duties |
| 2. Review | Your quotes, contracts, subcontracts and variation forms | We mark what fails the Act and what leaves you unpaid |
| 3. Drafting | Masters and the schedule for your trade | We draft homeowner terms, contracts, notices and subcontracts for each kind of job |
| 4. Delivery | Word documents ready for quoting and e-signing | We brief your office on Form 1, approvals, neighbour notices and payment claims |
We cannot promise that contracts prevent every dispute. Contracts that match how structural work is designed, approved and paid for settle the common questions before the work starts.
Before you sign the next structural job. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Is concreting building work in SA?
Yes, where it forms part of a building, wall or structure. Constructing a building, and excavating or filling a site for that work, is building work (Building Work Contractors Act 1995 section 3). Paving is building work too (regulation 4(1)(b)).
Do concreters and bricklayers need a builders licence?
Yes, to carry on a business of performing building work for others (Building Work Contractors Act section 6(1)). A licence can be limited to specified building work (Building Work Contractors Regulations 2026 Schedule 1 Part 3 clause 3(d)).
When does a structural job need Form 1?
For domestic building work at a cost to the owner of $20,000 or more. That applies to contracts made on or after 10 November 2025 (Building Work Contractors Act sections 3, 27(2), 28; regulation 4(4)).
Is underpinning building work?
Yes. Underpinning a building is named in the definition of building work (Building Work Contractors Act section 3).
Does a retaining wall need development approval?
A retaining wall retaining a difference in ground levels of no more than 1 metre is declared not to be development (Planning, Development and Infrastructure (General) Regulations 2017 Schedule 4 clause 4(1)(f)). The exclusion does not apply in designated flood areas or within 100 metres of the coast. A higher wall is outside it.
Does excavation near a boundary need a notice to the neighbour?
Where a development approval envisages access to the neighbour’s land to deal with an effect on its stability, yes. A notice in the prescribed form must be served at least 20 business days before the work starts (Planning, Development and Infrastructure Act section 139; General Regulations regulation 64(2a)). The regulations treat certain excavation and fill near a boundary as work affecting stability (regulation 64(2)).
Can a neighbour require underpinning of their house?
Where section 139 applies, yes. The neighbour may require the building owner to shore up any excavation, or to underpin, stabilise or otherwise strengthen the foundations of any building, to the extent its professional engineer specifies (General Regulations regulation 64(3)).
Does a concrete driveway crossover need council approval?
Altering a public road to permit access from an adjacent property needs the council’s authorisation (Local Government Act 1999 section 221(1), (2)(a)).
Can a concreting or bricklaying subcontractor make a payment claim?
Yes. Excavation, foundations and scaffolding are construction work (Security of Payment Act section 5(1)(e)), so a claim that meets section 13(2) can be served. Domestic building work on a home the client lives in is excluded (section 7(2)(b)).
Do I need a lawyer for concrete and masonry contracts?
The law does not require one, but structural contracts have to work with the builders licence rules, the approval and neighbour provisions and the statutory warranties. We draft concrete and masonry contracts for South Australian structural trades that match how the work is designed, approved and paid for.
Related guides
Related guides
- Concreter terms and conditions SA
- Decorative concreter terms and conditions SA
- Retaining wall builder terms and conditions SA
- Bricklayer terms and conditions SA
- Underpinning contractor terms and conditions SA
- Trade contracts SA
- Domestic building work contracts
- Minor domestic building work under $20,000
- Building deposits and progress payments
- Statutory warranties and defects
- Builders licence SA
- Subcontractor agreements