Trade Contracts SA: Tradie Terms and Conditions, Building Contracts and Subcontracts
Trade contracts in South Australia
A trade contract in South Australia has to do more than state a price. When the job is building work on a house, the Building Work Contractors Act 1995 (SA) decides what the contract must contain, how much can be taken up front and which warranties the owner gets. When the job is a subcontract or a commercial job, the Building and Construction Industry Security of Payment Act 2009 (SA) decides how payment claims work. Talon Legal drafts trade contracts, terms and conditions and subcontracts for South Australian trade businesses, from electricians and plumbers to builders, tilers and landscapers. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Trade contracts SA key facts
| Issue | Position in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA), Building Work Contractors Regulations 2026 (in force from 1 September 2026) and Building and Construction Industry Security of Payment Act 2009 (SA). Current to 20 November 2026. |
| What counts as building work | Constructing, erecting, underpinning, altering, repairing, improving, adding to or demolishing a building, excavating or filling a site for that work, and the prescribed classes: pools and spas, paving, fencing other than post and wire, insulation, painting, air-conditioning, solar panels, and plumbing, gas fitting and electrical work (section 3; regulation 4(1)). |
| Homeowner jobs | Building work on a house, or within the curtilage of a house, is domestic building work, and Part 5 of the Act governs the contract (section 3; regulation 4(2)). |
| The $20,000 threshold | Domestic building work under a contract made on or after 10 November 2025 at a cost to the owner of less than $20,000 is minor domestic building work (section 3; regulation 4(4)(c)). The contract formalities, deposit limits, insurance and cooling-off rules do not apply to it; the statutory warranties do (sections 27(2), 33(2), 36(2) and 32(2)). |
| Contracts of $20,000 or more | In writing, every term set out, the contractor's licence details included, signed by both parties, and a copy given to the owner with the prescribed notice, Form 1 (section 28(1)). |
| Deposits | Not more than 5% of the price where the price is $20,000 or more (section 30(4)(d)(ii)). Beyond that, only genuine progress payments for work already done, prescribed payments or Security of Payment Act entitlements (section 30(1), (2a)). |
| Warranties | Implied in every domestic building work contract and void if excluded (sections 32(2) and 42). Claims must start within five years after completion (section 32(5)). |
| Licence | A person who carries on business as a building work contractor needs a licence (section 6(1)). Plumbing, gas fitting and electrical contractors, pest controllers and security agents are exempt for work within their own licences (regulation 5(1) to (4)). |
| Unlicensed work | No fee or other consideration under or in relation to the contract unless the work was licensed or a court finds the failure resulted from inadvertence only (section 6(2)). |
| Subcontracts | A subcontract is not a domestic building work contract (section 3). The Security of Payment Act applies to construction contracts, written or oral (section 7(1) of that Act). |
| Owners who live there | The Security of Payment Act does not apply to domestic building work on the part of premises the owner resides in or proposes to reside in (section 7(2)(b) of that Act). |
| Pay when paid | A pay when paid provision in a construction contract has no effect (section 12 of the Security of Payment Act). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need a trade contract lawyer in Adelaide? What this guide covers
This guide maps the South Australian law that decides what a trade contract must say, current to 20 November 2026. It is the hub for our trade contract guides on domestic building work contracts, minor domestic building work under $20,000, building deposits and progress payments, variations to a building contract, statutory warranties and defects and builder’s licences.
Most tradies sign or issue three kinds of document: a quote or contract for the homeowner, a subcontract with a builder, and terms for commercial clients. Each one is governed differently. Our subcontractor agreements and terms of trade guides under Skilled Trades and Licensed Industries cover the second and third in more depth.
Free Consultation. Send us your current quote form, contract or terms before your next job. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Which laws govern a trade contract in SA?
- Is your work building work?
- Which contract fits which job?
- Do you need a builder's licence?
- What does a domestic building work contract need?
- Deposits, progress payments and getting paid
- Variations and price changes
- Warranties, defects and disputes
- Trades covered by these guides
- What a Talon trade contract pack covers
- How similar matters tend to play out
- How we build your trade contracts
- Trade contract case law
- Frequently asked questions
- Trade contract guides
Which laws govern a trade contract in SA?
Three statutes and one set of regulations do most of the work. Which of them applies turns on two questions: is the job building work, and who is the client.
| Law | What it decides for a trade business | Key provisions |
|---|---|---|
| Building Work Contractors Act 1995 (SA) | Who needs a licence, and the rules for domestic building work contracts: formalities, price, deposits and progress payments, warranties, insurance, cooling-off, court powers | Sections 3, 6, 7, 12, 27 to 40, 42, 47A, 50, 51 |
| Building Work Contractors Regulations 2026 | The prescribed classes of building work, the $20,000 minor work sum, the exemptions, the licence kinds of work, the Form 1 notice, the 15% cost-plus margin and the insurance limits | Regulations 4, 5, 7, 16 to 20, Schedules 1 and 2 |
| Building and Construction Industry Security of Payment Act 2009 (SA) | The right to progress payments under construction contracts, payment claims and schedules, due dates, adjudication, and the bar on pay when paid clauses | Sections 4 to 17 |
| Plumbers, Gas Fitters and Electricians Act 1995 (SA) | Licences for plumbing, gas fitting and electrical work, which also mark out the building work licence exemption for those trades | Section 3; Building Work Contractors Regulations 2026 regulation 5(1), (2) |
The 2026 Regulations replaced the Building Work Contractors Regulations 2011 from 1 September 2026. Precedents written before that date may cite the old regulation numbers or the $12,000 minor work sum, which stopped applying to contracts made on or after 10 November 2025 (regulation 4(4)).
The Building Work Contractors Act sits alongside other laws rather than replacing them: section 4 says its provisions are in addition to, and do not derogate from, any other Act.
Is your work building work?
Building work is defined in section 3 of the Act as the whole or part of the work of constructing, erecting, underpinning, altering, repairing, improving, adding to or demolishing a building, the work of excavating or filling a site for that work, and work of a prescribed class. Regulation 4(1) prescribes eight classes, and they are why so many trades sit inside the Act.
| Prescribed class (regulation 4(1)) | Trades it catches |
|---|---|
| On-site construction, alteration, repair or improvement of a swimming pool or spa | Pool and spa builders, pool renovators |
| Paving | Pavers, landscapers who lay paving |
| Fencing, other than post and wire fencing | Fencers, pool fence installers, landscapers |
| Installation, maintenance, repair and removal of insulation | Insulation installers |
| Painting a building or part of a building | Painters and decorators |
| Installation of air-conditioning in relation to a building | Air-conditioning and refrigeration installers |
| Installation of solar panels in relation to a building | Solar installers |
| Plumbing, gas fitting and electrical work within the meaning of the Plumbers, Gas Fitters and Electricians Act 1995 | Plumbers, gasfitters, electricians |
Two carve-outs matter for flooring trades. The Act does not apply to installing, maintaining, repairing or removing a floating floor under a contract made on or after 1 April 2010, or carpet or vinyl floor covering that is not used for waterproofing (regulation 5(11), (12)).
“Perform” in the Act includes causing, organising or arranging building work (section 3). A business that sells a job to a homeowner and arranges subcontractors to do it is performing building work, even if no one on its payroll picks up a tool.
Which contract fits which job?
The same trade business can need four different documents in the same week. The table sets out the rules that govern each kind of job and what the paperwork has to do.
| Job | Rules that govern it | What the contract has to do |
|---|---|---|
| Homeowner job under $20,000 (contract made on or after 10 November 2025) | Minor domestic building work. Part 5 Division 1 (sections 28 to 31), the insurance rules and the cooling-off right do not apply (sections 27(2), 33(2), 36(2)). The statutory warranties, harsh terms relief and the bar on contracting out do (sections 32, 38, 42). | Fix scope, price, payment and defect handling in writing even though section 28 does not demand it. |
| Homeowner job of $20,000 or more | Part 5 Division 1: section 28 formalities and Form 1, section 29 price rules, section 30 deposits and progress payments. Insurance where development approval is required (section 33). Cooling-off (section 36). | A full domestic building work contract, served with Form 1. |
| Work on a house for a landlord, investor or developer | Part 5 as above. The Security of Payment Act also applies, because its exclusion covers only the part of premises the owner resides in or proposes to reside in (section 7(2)(b)). | A domestic contract with payment terms that work under both Acts (section 30(1)(ab), (3)(b)). |
| Subcontract to a builder | Not a domestic building work contract (section 3). The Security of Payment Act applies. The builder must not contract with an unlicensed person for the building work (section 47A). | A subcontract with scope, variations, payment claims, retention and defects terms. |
| Commercial or industrial client | Not domestic building work. The Security of Payment Act applies to construction contracts (section 7(1)). | Commercial terms or a construction contract. |
| Demolition only, for a homeowner | Divisions 1, 3 and 4 of Part 5 do not apply (regulation 5(8)). The warranties in Division 2 are not exempted. | A demolition contract that deals with services, waste and neighbours. |
| Building owner that is a public company or its subsidiary | Sections 28, 29 and 30 and the cooling-off right do not apply (regulation 5(10)(b)). | A commercial-form contract. |
| Supply only, or hire | Supplying goods is not performing building work, but goods supplied for construction work can be related goods and services under the Security of Payment Act (section 6). | Terms of trade with retention of title and, for hire, hire terms. |
The third row reads section 7(2)(b) of the Security of Payment Act together with section 30 of the Building Work Contractors Act; no South Australian decision on the point was located. It turns on whether the owner lives in, or proposes to live in, the part of the premises being worked on.
Do you need a builder’s licence?
A person must not carry on business as a building work contractor, or advertise or hold out as entitled to, without a licence (section 6(1)). For a natural person the maximum penalty is $100,000 for a first or second offence and $150,000 or 12 months imprisonment, or both, for a later one; for a company, $500,000 and $550,000. The expiation fee is $5,000.
The licence is also a condition of being paid. An unlicensed contractor is not entitled to any fee, other consideration or compensation under or in relation to the contract unless a court is satisfied the failure resulted from inadvertence only (section 6(2)). The Supreme Court has held that this also takes away the right to Security of Payment Act progress payments (Tagara Builders Pty Ltd v AP & L Services Pty Ltd [2015] SASC 30 at [51]).
Plumbing, gas fitting and electrical contractors licensed under the Plumbers, Gas Fitters and Electricians Act are exempt from the building work contractors licence for work within their own licences (regulation 5(1), (2)). A licensed builder must not contract with an unlicensed person to carry out building work on its behalf (section 47A). The classes, conditions, supervisors and penalties are in our builder’s licence guide.
What does a domestic building work contract need?
A domestic building work contract of $20,000 or more must be in writing, set out all its terms, state the contractor’s licensed business name and licence number, comply with the regulations, be signed by both parties, and be given to the owner as a signed copy with Form 1, “Your building contract: your rights and obligations” (section 28(1)). Each failure is an offence by the contractor, with a maximum fine of $50,000 for an individual and $250,000 for a company (section 28(2)).
The price must be a fixed price unless the contract uses a permitted rise-and-fall or cost-plus clause, and then the words “This Price May Change” or “Estimate Only” must sit beside or below the affected price (section 29). Contracts with a charging clause, and pool or spa contracts made on or after 1 September 2026, must carry extra prescribed information (regulations 16 and 17).
The domestic building work contracts guide goes through every requirement, the cooling-off right and what happens when a contract does not comply.
Deposits, progress payments and getting paid
On a domestic building work contract of $20,000 or more, the only deposit allowed is one of not more than 5% of the price (section 30(4)(d)(ii)). After that, a contractor can demand only genuine progress payments for work already performed, prescribed payments such as third party professional fees and insurance, or what the Security of Payment Act entitles it to (section 30(1), (2a)). The owner need not make a progress payment unless the contractor has asked for it by written notice, unless the Security of Payment Act applies (section 30(3)).
On subcontracts and commercial jobs the Security of Payment Act gives a right to a progress payment from each reference date (section 8). A payment claim must identify the work, state the amount and state that it is made under the Act (section 13). A respondent who does not give a payment schedule within the time the contract allows, or 15 business days if that is earlier, becomes liable for the full claimed amount (section 14). Pay when paid clauses have no effect (section 12).
The details, with the dates the deposit limits changed, are in the building deposits and progress payments guide.
Variations and price changes
A domestic building work contract includes any variation of it (section 3). On a plain reading of sections 3 and 28, a variation of a contract to which section 28 applies is part of that contract, so it should be written, priced and signed in the same way. Rise-and-fall clauses are lawful only where the contract stipulates a completion period, and they stop applying to work done after that period unless the conditions in section 29(4) are met.
The District Court has held that where a domestic building contract allowed price adjustments only for variations instructed in writing, a builder could not use a quantum meruit claim to get around that (Cirocco Constructions Pty Ltd v Clarke (No 4) [2024] SADC 150 at [989], [993]). The variations guide sets out how to draft and price them.
Warranties, defects and disputes
Six warranties are implied in every domestic building work contract, including those under $20,000: proper work to accepted trade standards and the agreed plans, good and proper materials, compliance with statutory requirements, reasonable diligence where no completion period is set, fitness for habitation for a new house, and fitness for a purpose the owner made known (section 32(2)). A later owner of the house takes the benefit (section 32(3)). Any attempt to exclude, limit or waive them is void (section 42).
Proceedings must start within five years after the work is completed, and that period cannot be extended (section 32(5), (6)). The Court of Appeal has held that the 10-year limit for building claims in the planning legislation does not displace that five-year period (Duncan v Bert Farina Constructions Pty Ltd [2024] SASCA 67 at [3]).
Disputes about whether domestic building work was done in accordance with the contract can go to the Magistrates Court, which can order remedial work, payment or compensation (section 37). The statutory warranties and defects guide covers the claims process and the defences.
Trades covered by these guides
The trade contract guides are organised by trade family. The licence and homeowner columns state where the Act and Regulations put each family; individual trades within a family can differ, and each trade guide deals with its own position.
| Trade family | Trades | Licence position | Homeowner jobs |
|---|---|---|---|
| Builders and renovators | New home builders, renovators and extension builders, bathroom and kitchen renovators, granny flat builders, kit and transportable home builders, garage, carport and shed builders, apartment and multi-unit builders, commercial and industrial builders, shopfitters | Building work contractors licence (section 6) | Domestic building work (section 3) |
| Site preparation and demolition | Excavation, earthmoving, site cut and fill, demolition | Licence where the work is excavating or filling a site for building work, or demolishing a building (section 3) | Demolition-only contracts are outside Divisions 1, 3 and 4 (regulation 5(8)) |
| Civil and infrastructure | Civil contractors, drainage, roads and car parks | Licence where the work is building work; much civil work is construction work under the Security of Payment Act | Rarely domestic, except site works for a house |
| Concrete, masonry and structure | Concreters, bricklayers, blocklayers, steel fabricators | Building work contractors licence | Domestic building work |
| Roofing, cladding and windows | Roofers, roof plumbers, cladding installers, glaziers, window and door installers | Building work contractors licence; a plumbing contractor whose licence has no conditions may do minor roof plumbing under $3,000 without one (regulation 5(2)(b), (13)) | Domestic building work |
| Plumbing, gas and electrical | Plumbers, gasfitters, electricians, air-conditioning, solar and battery installers | Licence under the Plumbers, Gas Fitters and Electricians Act; exempt from the building work licence for work within it (regulation 5(1), (2)) | Domestic building work on a house (regulation 4(2)(e) to (g)) |
| Interiors, carpentry and finishes | Carpenters, framers, deck and pergola builders, painters, tilers, waterproofers, plasterers, cabinet makers, joiners, floor layers | Building work contractors licence; floating floors, carpet and vinyl (not waterproofing) are outside the Act (regulation 5(11), (12)) | Painting a house is domestic building work (regulation 4(2)(d)) |
| Outdoor, landscaping and pools | Landscapers, pavers, fencers, pool and spa builders | Paving, fencing other than post and wire, and pools are prescribed building work (regulation 4(1)(a) to (c)) | Building work within the curtilage of a house is domestic building work (regulation 4(2)(b)); pool contracts from 1 September 2026 need pool safety information (regulation 17) |
| Specialist trades | Insulation installers, pest and termite controllers, security alarm and CCTV installers | Insulation is prescribed building work (regulation 4(1)(d)); pest controllers and security agents are exempt for their licensed work (regulation 5(3), (4)) | Insulation work on a house is domestic building work (regulation 4(2)(c)) |
| Consultants and designers | Building designers, drafters, engineers, project managers | A business that organises or arranges building work performs it (section 3) | Some professional services are related goods and services under the Security of Payment Act (section 6) |
| Suppliers, hire and manufacturers | Trade suppliers, plant and equipment hire, frame and truss makers | Supply is not performing building work | Retention of title and guarantees, covered in the terms of trade guide |
What a Talon trade contract pack covers
We build trade contract packs from our own South Australian drafting, written for the way each trade actually prices, quotes and gets paid. A pack is quoted as a fixed fee before we start.
- A homeowner contract for jobs under $20,000, and a domestic building work contract for jobs of $20,000 or more, with the Form 1 notice step built into the signing process.
- A subcontract for work you do for builders, with payment claim terms that work under the Security of Payment Act.
- Terms for commercial clients and, where it suits the trade, call-out and maintenance terms.
- A quote acceptance form, a variation form, and payment claim and payment schedule templates.
- A trade schedule for your trade: scope wording, exclusions, materials and the warranties that suit the work.
Each document is checked against the Act and Regulations as they stand on the day we finish it. When the law changes, as it did with the $20,000 sum on 10 November 2025 and the new Regulations on 1 September 2026, we can update the pack.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
An electrician’s $14,000 switchboard and rewiring job for a homeowner. The contract is made after 10 November 2025 and the cost is under $20,000, so it is minor domestic building work. The section 28 formalities, the deposit limits and the cooling-off right do not apply. The statutory warranties still do, and they cannot be excluded. A short written contract that fixes the scope and the price still decides most of the disputes that come later.
A tiler working for a builder on a new house. The tiler’s contract is a subcontract, not a domestic building work contract. The builder carries the statutory warranties to the owner. The tiler’s right to progress payments comes from the subcontract and the Security of Payment Act, and the builder commits an offence by contracting with the tiler unless the tiler holds a building work contractors licence of the appropriate class or is exempt (section 47A).
A landscaper building a $38,000 pool surround, paving and fence for a landlord. The work is within the curtilage of a house, so it is domestic building work, and at $38,000 Division 1 applies: a written contract, Form 1, a deposit of not more than $1,900, and progress payments only for work done. Because the owner does not live there, the Security of Payment Act can also apply, which changes how payment claims are made.
How we build your trade contracts
We start from what your business actually does: who your clients are, how you quote and how you get paid. The law then decides which documents you need.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A short questionnaire about your trade, clients, job sizes and how you quote | We map your jobs against the Act, the Regulations and the Security of Payment Act |
| 2. Documents chosen | The contract set is fixed: homeowner, subcontract, commercial, forms | We confirm the pack and the fixed fee before drafting |
| 3. Drafting | The contracts and the trade schedule are written for your trade | We draft from our own South Australian precedents and current law |
| 4. Review | You read the drafts and send questions or changes | We explain each clause and make one round of changes |
| 5. Delivery | Final documents in Word and ready for e-signing | We set out how to issue Form 1 and how to use the variation and payment forms |
We cannot promise that any document prevents every dispute. A well-built contract decides most of them before they start, and it keeps the arguments that remain on your terms.
Before your next job. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Trade contract case law
These are the South Australian decisions the trade contract guides rely on most. The case notes state what each court decided.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Duncan v Bert Farina Constructions Pty Ltd [2024] SASCA 67 | Court of Appeal | The 10-year limit in the planning legislation does not displace the five-year limit for statutory warranty claims | [1] to [3], [141] |
| Forlyle Pty Ltd v Tiver [2007] SASC 464 | Supreme Court (Full Court) | A settlement that releases claims for future defects is void under section 42 to that extent | [19], [24] |
| Tagara Builders Pty Ltd v AP & L Services Pty Ltd [2015] SASC 30 | Supreme Court | An unlicensed contractor has no right to Security of Payment Act progress payments; the adjudication was void | [50] to [52] |
| Allied Grain Systems Pty Ltd v Inheritance Capital Asset Management Pty Ltd [2023] SASC 175 | Supreme Court | Ignorance of the licensing obligation can be inadvertence under section 6(2)(b) | [39], [41] |
| Commissioner for Consumer Affairs v Brittain [2007] SASC 381 | Supreme Court | Unlicensed domestic work led to convictions under sections 6, 28, 30 and 34 | [2], [5], [11], [21], [22] |
| Cirocco Constructions Pty Ltd v Clarke (No 4) [2024] SADC 150 | District Court | A written variation regime in a domestic building contract left no room for a quantum meruit claim | [989], [993] |
Case notes
Duncan v Bert Farina Constructions Pty Ltd [2024] SASCA 67
Later owners of a house sued the builder for defects, relying on the statutory warranties. The Court of Appeal held that section 73 of the Development Act 1993 and section 159 of the Planning, Development and Infrastructure Act 2016 operate as a 10-year long stop and do not displace the five-year limit in section 32(5) for statutory warranty claims; where both apply, the builder may rely on the shorter period ([3]). The owners’ appeal was dismissed ([141]).
Forlyle Pty Ltd v Tiver [2007] SASC 464
A builder and owners settled a defects dispute with a mutual release of all claims “known or unknown”. The Full Court held that a compromise of claims for future defects excludes, limits or waives the section 32 warranties and is void under section 42 to that extent ([19]). The words “or unknown” were severed and the rest of the settlement stood ([24]).
Tagara Builders Pty Ltd v AP & L Services Pty Ltd [2015] SASC 30
A ceilings and linings subcontractor company held no licence, although its director held one with conditions. Blue J held that section 6(2) disentitled the company to the contract price, so it was not entitled to progress payments under the Security of Payment Act and the adjudicator had no jurisdiction ([51]). The section does not prevent a claim in quantum meruit ([50]).
Allied Grain Systems Pty Ltd v Inheritance Capital Asset Management Pty Ltd [2023] SASC 175
An interstate company built in South Australia without a licence. Stanley J held that the inadvertence exception is met where the failure is due to ignorance of the obligation to be licensed, unless there was a wilful failure to make inquiries or reckless indifference ([39]), and found the company’s failure resulted from inadvertence only ([41]).
Commissioner for Consumer Affairs v Brittain [2007] SASC 381
A handyman franchisee quoted $27,000 for a driveway and carport for a neighbour, who accepted orally; there was no written contract and he held no licence ([4], [5]). He was convicted on his pleas of guilty of offences under sections 6, 28, 30 and 34 ([2]). Gray J described the purpose of the licensing scheme as public protection ([11]) and dismissed the Commissioner’s appeal against the single $2,500 fine ([21], [22]).
Cirocco Constructions Pty Ltd v Clarke (No 4) [2024] SADC 150
The domestic building contract confined price adjustments for variations to those the architect instructed in writing. The District Court held that there was no room for a quantum meruit claim to override that agreed allocation of risk ([989], [993]).
Frequently asked questions
What is a trade contract?
A trade contract is the agreement between a trade business and the person it works for: a homeowner, a builder or a commercial client. In South Australia the law that governs it depends on whether the job is building work under the Building Work Contractors Act 1995 (SA), whether it is domestic building work on a house, and whether the Building and Construction Industry Security of Payment Act 2009 (SA) applies.
Do tradies need a written contract in SA?
For domestic building work of $20,000 or more, yes. Section 28 of the Building Work Contractors Act requires a written, signed contract setting out all its terms, with Form 1 given to the owner. Below $20,000 the Act does not require writing, but the statutory warranties still apply and a written contract is the usual evidence of what was agreed.
What is the $20,000 rule for building work in SA?
Domestic building work under a contract made on or after 10 November 2025 at a cost to the owner of less than $20,000 is minor domestic building work (regulation 4(4)(c)). Division 1 of Part 5, the insurance rules and the cooling-off right do not apply to it. The threshold was $12,000 for contracts made from 15 October 2001 to 9 November 2025.
Are tradie terms and conditions enough for a homeowner job?
For a job under $20,000, well-drafted terms with a signed quote can be enough. For a job of $20,000 or more, terms and conditions alone usually fall short of section 28, which requires the full contract in writing, the licence details, both signatures and Form 1.
Does the Building Work Contractors Act apply to electricians and plumbers?
Yes for contracts. Plumbing, gas fitting and electrical work is prescribed building work (regulation 4(1)(h)), and on a house it is domestic building work (regulation 4(2)(g)), so Part 5 applies to the contract. For licensing, a contractor licensed under the Plumbers, Gas Fitters and Electricians Act is exempt from the building work licence for work within that licence (regulation 5(1), (2)).
Do painters and fencers need a builder's licence in SA?
Painting a building and fencing other than post and wire fencing are prescribed building work (regulation 4(1)(c), (e)). A business that carries on painting or fencing work for others is carrying on business as a building work contractor and needs a licence under section 6, unless an exemption applies.
How much deposit can a tradie ask for in SA?
On a domestic building work contract of $20,000 or more, not more than 5% of the price (section 30(4)(d)(ii)). Third party professional fees, building indemnity insurance and statutory fees can also be asked for in advance. Minor domestic building work under $20,000 sits outside section 30 for contracts made on or after 10 November 2025.
Does the Security of Payment Act apply to homeowners?
Not where the work is domestic building work on the part of premises the owner lives in or proposes to live in (section 7(2)(b)). It can apply to domestic building work for owners who do not live there, such as landlords and developers, and it applies to subcontracts and commercial construction contracts, written or oral.
Can a builder refuse to pay a subcontractor until the client pays?
No. A pay when paid provision in a construction contract has no effect under section 12 of the Security of Payment Act. A subcontractor’s progress payments fall due under the subcontract or, if it says nothing, 15 business days after a payment claim (section 11).
How long is a builder's warranty in South Australia?
Claims for breach of the statutory warranties must be started within five years after completion of the building work, and that period cannot be extended (section 32(5), (6)). The Court of Appeal confirmed in 2024 that the 10-year planning law limit does not displace it.
Can an unlicensed tradie be paid?
Not under the contract, unless a court finds the failure to be licensed resulted from inadvertence only (section 6(2)). The Supreme Court has held that the section does not prevent a claim in quantum meruit for the value of the work, but it does take away Security of Payment Act progress payments.
Do I need a lawyer to set up my trade contracts?
The law does not require one, but many tradie contract templates online are written for other states or for no state in particular. We draft contracts for South Australian trades that deal with the $20,000 threshold, Form 1, deposits and payment claims for the way your business actually works.
Trade contract guides
Related guides
- Domestic building work contracts
- Minor domestic building work under $20,000
- Building deposits and progress payments
- Variations to a building contract
- Statutory warranties and defects
- Builder's licence SA
- Builder contracts SA
- Plumbing and electrical contracts SA
- Finishing trades contracts SA
- Subcontractor agreements
- Terms of trade and retention of title
- Deeds of guarantee
- Equipment hire agreements
- Skilled Trades and Licensed Industries
- Commercial and Business