EV Charger Installer Terms and Conditions SA: Contracts for Electric Vehicle Chargers
EV charger installer terms and conditions in South Australia
An EV charger quote looks simple until the electrician opens the switchboard, or the client lives in a strata building. Most charger disputes are about the price of the upgrade nobody priced, or the approval nobody obtained. Talon Legal drafts EV charger installer terms and conditions, site assessment terms and commercial charging contracts for South Australian electrical contractors and charger retailers. Book a same-day free 30-minute consultation or call (08) 7094 2021.
EV charger installer terms and conditions SA key facts
| Issue | Position for EV charger installers in South Australia |
|---|---|
| Governing law | Plumbers, Gas Fitters and Electricians Act 1995 (SA); Electricity Act 1996 (SA); Strata Titles Act 1988 (SA); Community Titles Act 1996 (SA); Australian Consumer Law. Current to 21 November 2026. |
| Licences | A wall charger wired into the installation is electrical work, needing a licensed electrical contractor and registered workers (PGE Act sections 3, 6(1), 13). |
| Plug-in charging | Equipment connected to and beyond an outlet socket at which fixed wiring terminates is exempt, but a new outlet or circuit is not (PGE Regulations regulation 4(5)(c)(iii)). |
| Certificates | The contractor that engaged the registered worker is responsible for notification and certificates of compliance (Electricity Act section 61(2)(a)). |
| Strata buildings | Erecting or altering a structure, or altering the external appearance of a building, in relation to a unit needs a special resolution of the strata corporation (Strata Titles Act section 29(1)). |
| Charging promises | Misleading conduct is prohibited, and goods must be reasonably fit for a disclosed purpose (Australian Consumer Law sections 18, 55). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need EV charger installer terms and conditions? What this guide covers
This guide covers what is particular to EV charger installer terms and conditions in South Australia, current to 21 November 2026: licences, capacity checks and switchboard upgrades, strata and community title buildings, the charger, the car and the app, certificates and handover, commercial and fleet sites, and getting paid. The law all plumbing, gas and electrical trades share is in the plumbing and electrical contracts SA guide.
We act for electrical contractors that install chargers, charger retailers and businesses that fit out fleet and visitor car parks.
Free Consultation. Send us your quote form, your site assessment sheet or your strata approval letter. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Licences for a charger installation
- Capacity checks and switchboard upgrades
- Strata and community title buildings
- The charger, the car and the app
- Commissioning, certificates and handover
- Commercial, fleet and visitor charging
- Getting paid for charger work
- What the EV charger pack holds
- How similar matters tend to play out
- EV charger case law
- How we build EV charger installer terms and conditions
- Frequently asked questions
- Related trade contract guides
Licences for a charger installation
| Part of the job | What it is | Authority needed |
|---|---|---|
| Wall charger on its own circuit | Electrical work (PGE Act section 3) | Electrical contractor licence; registered electrical worker |
| New power outlet for a portable charger | Electrical work (section 3) | The same |
| Portable charger plugged into an existing outlet | Equipment beyond an outlet socket; exempt (PGE Regulations regulation 4(5)(c)(iii)) | None for the plugging in |
| Switchboard, submain or meter box upgrade | Electrical work (section 3) | Electrical contractor licence |
| Charger post, bollard or trenching | Building or civil work around the electrical job | A builders licence for building work beyond what the electrical licence authorises (Building Work Contractors Regulations regulation 5(1)) |
A retailer that sells chargers “supplied and installed” performs the installation, because “perform” includes causing, organising or arranging the work (PGE Act section 3). An unlicensed contractor is not entitled to any fee for that work unless a court is satisfied the failure resulted from inadvertence only (section 6(2)).
Capacity checks and switchboard upgrades
The site decides the price. A quote given before anyone has looked at the switchboard should say so.
| Assessment item | What the terms say |
|---|---|
| Supply capacity | The supply and switchboard capacity found, and the load assessment the recommendation relies on |
| Upgrade needed | Whether a switchboard, submain or protection upgrade is included, excluded or priced as an option |
| Cable route | Distance, walls, ceilings and trenching assumed in the price |
| Distributor approvals | Who applies to the electricity distributor for any approval the job needs |
| Hidden conditions | Asbestos in a meter board, old wiring and damaged cables, and what happens when they are found |
Upgrades found during the job are variations, and the terms should require approval before the work and a price for it. In Rapuano, below, an electrician’s switchboard had to be expanded because the job grew with the owners’ changes, and the Court valued his work on proven hours at a reasonable rate.
Strata and community title buildings
| Scheme | The rule | Where it is |
|---|---|---|
| Strata scheme | Prescribed work in relation to a unit, meaning erecting, altering, demolishing or removing a building or structure, or altering a building's external appearance, needs a special resolution (or the articles, where every unit is non-residential) | Strata Titles Act section 29(1), (6) |
| Strata scheme | Work done without authority can be met with a notice to remedy any structural deficiency or restore the unit | section 29(2) |
| Community strata scheme | The same rule for strata lots, with power to enter and recover the cost | Community Titles Act section 102 |
| Community scheme | By-laws govern the common property and can regulate the external appearance of buildings and improvements on lots | section 34(2), (3) |
On a reading of those provisions, a charger in a basement car park on common property, or a charger post that changes how a building looks, needs the body corporate’s approval before the electrician starts. The terms should make approval the owner’s responsibility, make work conditional on it, and let the installer cancel without cost if approval is refused.
In Piazza, below, other owners in a strata scheme failed to establish that a telecommunications tower on one owner’s unit subsidiary had been put up unlawfully, and the Court would not order owners to pass a resolution without hearing from them.
The charger, the car and the app
- Compatibility. The car, the connector and the charging rate the car accepts.
- Charging speed. Speed depends on the car, the charger and the supply. A quoted speed should state those assumptions. Misleading conduct is prohibited (Australian Consumer Law section 18(1)), and loss caused by it is recoverable (section 236(1)).
- Disclosed purpose. Where the client says what the charger is for, such as charging overnight from solar, it must be reasonably fit for that purpose (section 55).
- Apps and accounts. Who sets up the app, the network connection the charger needs, and that subscription services are the provider’s, not the installer’s.
- Load management. Whether the charger is set to limit its draw, and who changes the setting later.
Commissioning, certificates and handover
| Step | What the terms deal with |
|---|---|
| Testing | The tests the regulations require, carried out before handover |
| Certificate | The contractor is responsible for notification and certificates of compliance (Electricity Act section 61(2)(a)); an owner may rely on a certificate (section 60(2)) |
| Settings | Current limits, schedules and load management settings recorded |
| Manuals and warranty | Manuals handed over, and who registers the manufacturer's warranty |
| Strata copy | A copy of the certificate and approval for the body corporate's records |
Commercial, fleet and visitor charging
- Security of Payment Act. The installation of fittings such as power supply systems in a building is construction work (section 5(1)(c)), so payment claims are available if they meet section 13(2).
- Not household goods. For goods or services not ordinarily acquired for household use, liability can be limited to repair, replacement or supplying the services again (Australian Consumer Law section 64A), unless that is not fair or reasonable.
- Staging. Separate prices for infrastructure now and chargers later, with the cable sizes designed for the final number.
- Software and billing. Charging network software and payment services can sit in separate contracts; the installation terms should say which applies.
Getting paid for charger work
- Domestic contracts. Electrical work at a house is prescribed building work (Building Work Contractors Regulations regulation 4(1)(h)). A domestic job under $20,000 is minor domestic building work, and Division 1 of Part 5 does not apply (section 27(2)).
- Charging clauses. A domestic electrical contract with a charging clause must be in writing, signed, carry the licence numbers and come with the prescribed notice (PGE Act section 33B).
- Hourly work. Where the price is by the hour, the terms should state the rate and require timesheets. Rapuano shows a court assessing a claim on proven hours where no price was agreed.
What the EV charger pack holds
An EV charger pack is built from our masters and an EV charger schedule, and quoted as a fixed fee before we start.
- Supply and installation terms with a site assessment and upgrade options.
- Strata and community title terms that make approval a condition.
- Variation forms for switchboard and cabling changes.
- Commercial and fleet terms with staged infrastructure and payment claims.
- A charging speed and compatibility statement for the quote.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
The old switchboard. An electrician arrives to fit a charger and finds a board that cannot take the load. The quote said a switchboard upgrade was excluded and would be priced if needed. The client approves the variation in writing before work continues.
The apartment car park. An owner in a unit block asks for a charger in their car space. The terms make the strata corporation’s approval a condition, and the installer waits for the resolution before running cable through common property.
The charger that seemed slow. A client complains a new charger is slower than a friend’s. The quote stated the charge rate for the client’s car and supply, and the handover sheet recorded the current limit set.
EV charger case law
None of the decisions below concerned an EV charger. Each decides a rule a charger business runs into.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Rapuano t/as Raps Electrical v Karydis-Frisan [2011] SADC 122 | District Court | An electrician with no concluded contract was paid the reasonable value of his work; a switchboard expansion caused by the owners' variations was not deducted | [1], [420], [421], [423] |
| Piazza v Strata Corporation 10147 Inc [2019] SADC 38 | District Court | Other owners failed to establish that a telecommunications tower on a unit subsidiary breached the Strata Titles Act or infringed common property | [4], [61], [62], [65], [71] |
Case notes
Rapuano t/as Raps Electrical v Karydis-Frisan [2011] SADC 122
An electrician did electrical work on a house being built, and the owners paid the first invoice, part of the second and none of the third ([1]). Judge Stretton found that the switchboard had to be expanded because the job grew with the owners’ variations, so no deduction was made for it ([420]). The reasonable value of the work was the proven hours at a reasonable hourly rate, plus materials and subcontract labour with a 15% mark-up ([421]). The electrician’s own hours were allowed at 80% of those claimed, at $50 an hour ([423]).
Piazza v Strata Corporation 10147 Inc [2019] SADC 38
A unit owner leased part of its unit subsidiary for a 29.31 metre telecommunications tower, and other owners said the airspace above three metres was common property ([4]). Auxiliary Judge Clayton found no breach of the Strata Titles Act by either defendant ([61]), that the evidence did not establish the tower was unlawfully obtained ([62]), and no basis for a declaration that it infringed common property ([65]). The Court said it could not order owners to pass a resolution without first hearing from them ([71]).
How we build EV charger installer terms and conditions
We start with how you assess sites, how you price upgrades and how you handle strata clients.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licences, charger brands, site assessments and strata work | We sort your jobs into houses, strata buildings and commercial sites |
| 2. Review | Your quotes, assessment sheets, approval letters and handover documents | We mark excluded upgrades, speed claims and approval gaps that need fixing |
| 3. Drafting | Masters and the EV charger schedule | We draft your installation terms, strata conditions and commercial terms |
| 4. Delivery | Word documents and a site assessment checklist | We brief your electricians and sales staff on upgrades, approvals and records |
We cannot promise that terms prevent every dispute. Terms that price the site as it is, and wait for the approvals the building needs, decide most of them before they start.
Before your next charger quote goes out. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Do you need an electrician to install an EV charger in SA?
For a charger wired into the installation, yes. It is electrical work, needing a licensed electrical contractor and a registered worker (PGE Act sections 3, 6(1), 13).
Is plugging a portable EV charger into a power point licensed work?
Plugging equipment into an existing outlet is exempt work, but installing a new outlet or circuit for it is electrical work (PGE Regulations regulation 4(5)(c)(iii)).
Who pays for a switchboard upgrade for an EV charger?
The contract decides. The quote should say whether an upgrade is included, excluded or priced as an option, and any upgrade found later should be approved as a variation.
Do you need strata approval to install an EV charger?
Work that erects or alters a structure, or alters a building’s external appearance, in relation to a unit needs a special resolution (Strata Titles Act section 29(1)). Community strata schemes have the same rule (Community Titles Act section 102).
What happens if the body corporate says no?
The installer’s terms should make approval the owner’s responsibility and let the installer cancel without cost. In Piazza, the Court would not order owners to pass a resolution without hearing from them.
Who gives the electrical certificate for an EV charger?
The contractor that engaged the registered worker is responsible for notification and certificates of compliance (Electricity Act section 61(2)(a)), and the owner may rely on the certificate (section 60(2)).
What if the charger charges more slowly than promised?
A charging speed statement that is misleading contravenes section 18 of the Australian Consumer Law, and where the client disclosed the purpose the charger must be reasonably fit for it (section 55). The quote should state the car, supply and current limit assumed.
Does an EV charger installation need a written contract?
A domestic job under $20,000 is minor domestic building work, so Division 1 of Part 5 does not apply (section 27(2)). A domestic electrical contract with a charging clause must still meet section 33B of the PGE Act.
Can a commercial charger installer use the Security of Payment Act?
Yes. Installing power supply systems in a building is construction work (section 5(1)(c)), and payment claims must meet section 13(2).
Do I need a lawyer for EV charger installer terms and conditions?
The law does not require one, but a charger job turns on a site assessment, an upgrade price and sometimes a strata approval. We draft EV charger installer terms and conditions for South Australian electrical businesses that settle each of them in writing.
Related trade contract guides
Related guides
- Plumbing and electrical contracts SA
- Electrician terms and conditions SA
- Battery installer terms and conditions SA
- Solar installer terms and conditions SA
- Smart home installer terms and conditions SA
- Apartment builder terms and conditions SA
- Variations to a building contract
- Minor domestic building work SA
- Trade contracts SA
- Subcontractor agreements