Bricklayer Terms and Conditions SA: Bricklaying and Blocklaying Contracts
Bricklayer terms and conditions in South Australia
Brickwork is laid once and looked at for the life of the house. A bricklayer works to someone else’s selections, with bricks someone else may have bought, at a rate that has to cover the scaffold, the weather and the clean-down. When the mortar is wrong, the remedy can be rebuilding the walls. Talon Legal drafts bricklayer terms and conditions, bricklaying subcontracts and homeowner contracts for South Australian bricklayers and blocklayers. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Bricklayer terms and conditions SA key facts
| Issue | Position for bricklayers in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA) and Regulations 2026; Building and Construction Industry Security of Payment Act 2009 (SA); Work Health and Safety Regulations 2012 (SA); Australian Consumer Law. Current to 21 November 2026. |
| Brickwork as building work | A building includes a wall, so laying brick and block walls is building work (section 3). |
| Work for builders | A subcontract, not a domestic building work contract (section 3); the Security of Payment Act applies. |
| Work for owners | Domestic building work at a house (regulation 4(2)(b)); Division 1 and Form 1 at $20,000 or more (sections 27(2), 28). |
| Warranties | Proper work to accepted trade standards and the agreed specifications, and good and proper materials (section 32(2)(a), (b)). |
| Scaffold | Work with a risk of a fall of more than 2 metres is high risk construction work, needing a safe work method statement (Work Health and Safety Regulations regulations 291(a), 299). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need bricklayer terms and conditions? What this guide covers
This guide covers what is particular to bricklayer terms and conditions in South Australia, current to 21 November 2026. It deals with the licence, subcontracts and homeowner jobs, rates and who supplies the bricks, mortar and the specification, scaffold and weather, payment claims, and stopping work. The rules every structural trade shares are in the concrete and masonry contracts SA guide.
We act for bricklaying and blocklaying businesses that work for builders, and those who quote homeowners for walls, extensions and repairs.
Free Consultation. Send us the subcontract or terms you use now. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- The licence, subcontracts and homeowner jobs
- Rates, quantities and who supplies the bricks
- Mortar, colour and the specification
- Scaffold, weather and cleaning
- Payment claims for brickwork
- Stopping work and termination
- What the bricklaying pack holds
- How similar matters tend to play out
- Bricklaying case law
- How we build bricklayer terms and conditions
- Frequently asked questions
- Related trade contract guides
The licence, subcontracts and homeowner jobs
A building includes a wall, so laying brick and block walls for others is building work (section 3), and carrying on that business needs a licence (section 6(1)). A licence can be limited to specified building work, and some limited licences cover only subcontract work for a licensed contractor (Schedule 1 Part 3 clause 3(d)). A bricklayer with that kind of licence should check it before quoting an owner directly.
| Bricklaying job | Rules |
|---|---|
| Brickwork for a builder | A subcontract, not a domestic building work contract (section 3); the Security of Payment Act |
| A wall, extension or repair for an owner under $20,000 | Minor domestic building work: the statutory warranties in section 32 apply; Division 1 does not (section 27(2); regulation 4(4)) |
| The same job at $20,000 or more | Division 1: a written contract with every term, licence details, signatures and Form 1 (section 28), a fixed price (section 29), a deposit of no more than 5% (section 30(4)), cooling-off (section 36) |
| Commercial and multi-unit work | Commercial terms or a subcontract; the Security of Payment Act; unfair contract terms if the client is a small business |
A variation is part of a domestic building work contract (section 3), so extra courses, a feature wall or a change of brick can take an owner’s job over $20,000.
Rates, quantities and who supplies the bricks
Brickwork is priced in more than one way, and the terms should say which applies.
| Term | What it settles |
|---|---|
| Price basis | A rate per thousand bricks or per square metre, a lump sum, or a day rate |
| Counting | How bricks are counted for a rate: by the drawings, by deliveries, or by a measure on site |
| Supply | Whether the builder or owner supplies bricks, mortar materials and lintels, or the bricklayer does |
| Owner-supplied bricks | That quantity, colour consistency and damage before laying sit with the supplier of the bricks |
| Extras | Rates for cuts, feature work, arches, sills and work at height |
On a homeowner job, the statutory warranties still cover the bricklayer’s own work where the client supplies the bricks (section 32(2)(a)). The warranty of good and proper materials applies to materials the contractor supplies (section 32(2)(b)), so the terms should say who supplied what.
Mortar, colour and the specification
Mortar decides whether brickwork lasts and how it looks. The statutory warranties require the work to be performed in a proper manner, to accepted trade standards and in accordance with the agreed plans and specifications (section 32(2)(a)).
In Manolakis, below, the building specification required the mortar to comply with a clause and table of the Australian Standard for masonry ([10]). The owners had selected modular bricks with natural mortar ([2]). The Court found that the mortar did not comply with the Standard as to composition or durability, and that the builder had breached its contract ([75]). Raking and repointing the joints would not give the owners what they contracted for, and rebuilding the brickwork was necessary and reasonable ([82], [93]).
The terms should record:
- the brick and mortar selections, with the colour, the brand and the mix, signed by the client;
- the standard or specification the mortar must meet, where the drawings or specification name one;
- any instruction the client insists on against the bricklayer’s written advice, because on a homeowner job a deficiency arising from an owner’s instruction of that kind is a defence to a warranty claim (section 32(7)); and
- the control joints, from the drawings or the engineer.
Scaffold, weather and cleaning
| Issue | What the terms should say |
|---|---|
| Scaffold | Who supplies, erects and certifies it, and who pays for hire beyond the agreed period |
| Weather | That time lost to rain or extreme heat extends the time for completion |
| Site readiness | Slab, set-out and materials ready on arrival, with a charge for a wasted visit |
| Cleaning | Whether the price includes cleaning the brickwork, and the method |
| Protection | Who protects the work from rain and damage after laying |
Construction work with a risk of a person falling more than 2 metres is high risk construction work (Work Health and Safety Regulations 2012 regulation 291(a)). A business carrying out that work must have a safe work method statement prepared before it starts (regulation 299(1)). Erecting scaffolding is construction work under the Security of Payment Act (section 5(1)(e)(iii)).
Payment claims for brickwork
Brickwork for a builder is construction work under the Security of Payment Act, so a bricklayer can claim progress payments as the work proceeds.
- Payment claims. A claim must identify the work, state the amount and say it is made under the Act (section 13(2)).
- Payment schedules. A respondent that does not give a schedule within the contract time, or 15 business days if earlier, becomes liable for the claimed amount (section 14(4)).
- Pay when paid. A clause making payment depend on the head contractor being paid has no effect (section 12).
- Homeowners. The Act does not apply to domestic building work on premises the owner lives in or proposes to live in (section 7(2)(b)).
Claims by lift or by stage are easier to prove than claims by a percentage of the whole job. The subcontract should define the stages and the measure.
Stopping work and termination
A bricklayer that is not paid has to choose its next step with care. In Kennett, below, a bricklaying subcontractor on a health care facility disputed progress and variation claims, suspended work and set conditions for its return. The Court found that conduct repudiatory ([155]). The builder lawfully terminated and recovered $226,212.22 in damages, and the subcontractor’s counterclaim was dismissed ([259]).
The Security of Payment Act provides its own route where a claimed or scheduled amount is not paid, including recovery as a debt and a notice of suspension that states it is made under the Act (sections 15, 16). The subcontract should set out the notice steps for suspension and termination so that a stop in work follows a process, not a dispute on site.
What the bricklaying pack holds
A bricklaying pack is built from our masters and a bricklaying schedule, and quoted as a fixed fee before we start.
- A subcontract for builders with rates, counting rules, stages, payment claim and schedule procedures, and suspension and termination notices.
- Homeowner terms for jobs under $20,000 and a domestic building work contract with Form 1 for larger jobs.
- A selections sheet for bricks, mortar colour and mix, signed by the client.
- A site readiness and scaffold clause, with charges for wasted visits.
- A variation form that keeps a running contract total.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
The bricks from two batches. The builder supplies bricks from two deliveries and the wall shows a band of colour. The subcontract put colour consistency of supplied bricks on the supplier, and the bricklayer had blended from both pallets as the selections sheet required.
The rain-delayed lift. Three weeks of rain delay the second lift. The subcontract extends time for weather, so the builder’s delay charge does not apply.
The unpaid lift. A builder does not pay a claim for a completed lift. The bricklayer does not walk off the job with conditions for its return. It serves a payment claim under the Security of Payment Act and, when no schedule arrives within 15 business days, recovers the amount as a debt.
Bricklaying case law
None of the decisions below set a standard for every bricklaying contract; one concerned a builder’s contract with owners, the other a bricklaying subcontract. Each turned on a point a bricklayer can face.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Manolakis v Galaxy Homes Pty Ltd [2003] SADC 80 | District Court | Mortar that did not meet the Standard the specification named was a breach; rebuilding the brickwork was necessary and reasonable | [10], [75], [82], [93], [146] |
| Kennett Pty Ltd v Janssen [2014] SASC 164 | Supreme Court | A bricklaying subcontractor that suspended work and set conditions for its return repudiated the subcontract | [4], [155], [259] |
Case notes
Manolakis v Galaxy Homes Pty Ltd [2003] SADC 80
Owners contracted with a builder for a new house, selecting modular bricks with natural mortar ([1], [2]). The building specification required the mortar to comply with a clause and table of AS 3700 ([10]). The bricklayer engaged by the builder laid the brickwork, and the owners complained of the colour of the mortar from the first days ([15], [16]). Judge Anderson found that the mortar did not comply with the Standard as to composition or durability, a breach of the builder’s contract to do the work properly and skilfully and with good and proper materials ([75]). His Honour found that raking and repointing would not give the owners what they contracted for, and that removing and replacing the brickwork was necessary and reasonable ([82], [93]). Damages were assessed at $47,587.06, including the cost of rebuilding three elevations and a garage wall ([146]).
Kennett Pty Ltd v Janssen [2014] SASC 164
A commercial builder engaged a bricklaying subcontractor on a health care facility for $423,080 ([4]). They disputed progress and variation claims, and the subcontractor suspended work and set conditions for its return. Blue J found that conduct repudiatory ([155]). The builder lawfully terminated, had judgment for damages of $226,212.22, and the subcontractor’s counterclaim was dismissed ([259]).
How we build bricklayer terms and conditions
We start with how you price, lay and claim: who supplies the bricks, how you count, and who you work for.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licence, rates, builders and homeowner work | We sort your work into subcontracts, minor work and Division 1 contracts |
| 2. Review | Your quotes, subcontracts, claim forms and selections sheets | We mark the supply, specification and payment terms that leave you exposed |
| 3. Drafting | Masters and the bricklaying schedule | We draft a subcontract, homeowner terms, a selections sheet and notices |
| 4. Delivery | Word documents ready for quoting and claiming | We brief your office on payment claims, schedules and suspension steps |
We cannot promise that terms prevent every dispute. Terms that fix the selections, the measure and the payment steps settle those questions before the scaffold comes down.
Before your next bricklaying quote goes out. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Do bricklayers need a builders licence in SA?
Yes. A building includes a wall, so laying brick and block walls for others is building work, and carrying on that business needs a licence (Building Work Contractors Act 1995 sections 3, 6(1)).
Is a bricklaying subcontract a domestic building work contract?
No. A subcontract for domestic building work is not a domestic building work contract (Building Work Contractors Act section 3). The Security of Payment Act applies to it.
Can a bricklayer make a payment claim against a builder?
Yes. A claim must identify the work, state the amount and say it is made under the Security of Payment Act (section 13(2)). A builder that gives no schedule in time becomes liable for the claimed amount (section 14(4)).
Who is responsible for the colour of supplied bricks?
The contract decides. The warranty of good and proper materials applies to materials the contractor supplies, so the terms should say who supplied the bricks and who carries their consistency (Building Work Contractors Act section 32(2)(b)).
Is wrong mortar a defect?
It can be. In Manolakis, mortar that did not meet the Standard named in the specification was a breach, and rebuilding the brickwork was found necessary and reasonable.
Can a bricklayer rely on the client's instructions?
On a homeowner job, it is a defence to a warranty claim that a deficiency arose from instructions the owner insisted on contrary to the contractor’s written advice (Building Work Contractors Act section 32(7)). The advice must be in writing.
Can a bricklayer stop work if it is not paid?
Only by a lawful route. In Kennett, a subcontractor that suspended work and set conditions for its return repudiated the subcontract. The Security of Payment Act sets out its own steps (sections 15, 16).
Does bricklaying on scaffold need a safe work method statement?
Where there is a risk of a fall of more than 2 metres, yes. That is high risk construction work (Work Health and Safety Regulations 2012 regulations 291(a), 299(1)).
How much deposit can a bricklayer take from a homeowner?
For a homeowner job of $20,000 or more, no more than 5% of the price. Later payments can only be genuine progress payments for work already performed (Building Work Contractors Act section 30(1), (4)).
Do I need a lawyer for bricklayer terms and conditions?
The law does not require one, but bricklaying terms have to work with the builders licence rules, the statutory warranties and the payment claim rules. We draft bricklayer terms and conditions for South Australian bricklaying businesses that get the selections and the payment steps on paper.
Related trade contract guides
Related guides
- Concrete and masonry contracts SA
- Concreter terms and conditions SA
- Retaining wall builder terms and conditions SA
- Renovation builder terms and conditions SA
- Subcontractor agreements
- Statutory warranties and defects
- Variations to a building contract
- Building deposits and progress payments
- Builders licence SA
- Trade contracts SA