Tiler Terms and Conditions SA: Tiling Contracts and Quotes
Tiler terms and conditions in South Australia
Tiling is the last visible layer of a bathroom, kitchen or floor, laid over work that other trades did first. When tiles crack, drum or leak, the first question is whose layer failed, and a tiler’s terms decide much of the answer. Tiling is building work under the Building Work Contractors Act 1995 (SA), so a tiling business needs a builders licence, and a homeowner job of $20,000 or more needs a full domestic building work contract. Talon Legal drafts terms, contracts and subcontracts for South Australian tilers and tiling businesses. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Tiler terms and conditions SA key facts
| Issue | Position for tilers in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA) and Regulations 2026; Security of Payment Act 2009 (SA); Australian Consumer Law. Current to 20 November 2026. |
| Building work | Tiling alters or improves a building, so it is building work (section 3); outdoor paving is prescribed building work too (regulation 4(1)(b)). |
| Licence | A building work contractors licence (section 6(1)), which may be limited to tiling or to subcontract work for licensed builders (section 7; Schedule 1 Part 3). |
| Floor coverings outside the Act | Floating floors and carpet or vinyl not used for waterproofing are outside the Act; tiles are not (regulation 5(11), (12)). |
| Homeowner jobs | Domestic building work (section 3). Under $20,000 it is minor domestic building work for contracts made on or after 10 November 2025; at $20,000 or more a section 28 contract with Form 1 is needed. |
| Warranties | Proper work to accepted trade standards, good and proper materials supplied by the contractor, and fitness for a purpose the owner made known (section 32(2)); five years to sue (section 32(5)). |
| Owner's insistence | Deficiencies from instructions the owner insisted on against the tiler's written advice are a defence to a warranty claim (section 32(7)). |
| Deposits | Not more than 5% on homeowner jobs of $20,000 or more (section 30(4)(d)(ii)). |
| Work for builders | A subcontract (section 3); the Security of Payment Act applies and pay when paid clauses have no effect (section 12 of that Act). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need tiler terms and conditions? What this guide covers
This guide covers what is particular to tiler terms and conditions in South Australia, current to 20 November 2026: the licence a tiling business needs, the contract for each kind of tiling job, the clauses tiling terms need, what decides a tiling dispute and how tilers get paid. The law tilers share with carpenters, painters and other finishing trades is in the finishing trades contracts SA guide, and the building contract rules for every trade are in trade contracts SA.
We act for wall and floor tilers, bathroom tiling specialists and tiling contractors who work for builders and renovators.
Free Consultation. Send us your quote and terms, or the subcontract a builder wants you to sign. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Which licence does a tiling business need?
- Which contract fits which tiling job?
- The clauses that matter in tiler terms and conditions
- What decides a tiling dispute?
- Getting paid for tiling
- What the tiler pack holds
- How similar matters tend to play out
- How we build tiler terms and conditions
- Frequently asked questions
- Related trade contract guides
Which licence does a tiling business need?
Tiling a wall or floor alters or improves a building, which makes it building work (section 3), and a business that does it for others needs a building work contractors licence (section 6(1)). The Regulations take floating floors and carpet or vinyl that is not used for waterproofing out of the Act (regulation 5(11), (12)), but not tiles.
A tiling licence may be limited by conditions (section 7). Two kinds of limit matter for tilers.
- Trade limits. A licence limited to tiling covers tiling. A tiler who also rebuilds the shower base, relocates a wall or replaces wet area sheeting is doing building work beyond it, and a tiler who relocates the pipework for a tap or a waste is doing plumbing work, which needs a plumbing licence.
- Subcontract limits. A licence for other specified building work done only on a subcontract basis for licensed contractors (Schedule 1 Part 3 of the Regulations) does not cover a bathroom retile contracted directly with a homeowner.
Waterproofing is building work as well. Whether the tiler or a separate waterproofer applies the membrane, the contract should say who does it and who answers for it.
A licensed builder must not engage an unlicensed tiler for building work on its behalf (section 47A), so builders will ask for the licence number and its conditions; a tiler’s subcontract should state them. The builders licence guide covers licence classes and supervisors.
Which contract fits which tiling job?
| Tiling job | Rules that govern it | Document |
|---|---|---|
| Splashback, small floor or repair for a homeowner, under $20,000 | Minor domestic building work for contracts made on or after 10 November 2025; the statutory warranties apply | Small job agreement with a written quote |
| Bathroom retile, with or without waterproofing, under $20,000 | Minor domestic building work; warranties apply, including fitness for a purpose the owner made known | Small job agreement with substrate and waterproofing terms |
| Bathroom or whole-house tiling of $20,000 or more for a homeowner | Division 1 of Part 5: section 28 contract and Form 1, price rules, deposit cap, cooling-off | Domestic building work contract |
| Outdoor tiling or paving around a house | Paving is prescribed building work, and work within the curtilage of a house is domestic building work (regulation 4(1)(b), 4(2)) | Small job agreement or domestic building work contract |
| Tiling for a builder or bathroom renovator | A subcontract (section 3); the Security of Payment Act | Tiling subcontract with claims, retention and defects terms |
| Commercial tiling | Not domestic building work; the Security of Payment Act; unfair contract terms if either side is a small business | Commercial terms or subcontract |
The clauses that matter in tiler terms and conditions
| Clause | Why it matters for tilers |
|---|---|
| Substrate inspection and acceptance | Tiles are only as good as what they are laid on. The terms should require the tiler to inspect before starting, record defects in walls, screeds, sheeting or slabs, and stop until they are fixed. |
| Written advice | If the owner wants tiling over a substrate the tiler considers unsuitable, written advice gives the tiler a defence to a later warranty claim about the resulting deficiency (section 32(7)). |
| Waterproofing | Who applies the membrane, who certifies it, how long it cures and whether the tiler relies on someone else's membrane. A leak claim will turn on this clause. |
| Who supplies the tiles | The materials warranty covers materials the contractor supplies (section 32(2)(b)). Owner-supplied tiles should be checked for shade, batch and damage before laying, and the terms should say who bears breakage and shortfall. |
| Wastage and ordering | State the wastage allowance, lead times for special orders and whether a deposit covers them. On homeowner jobs of $20,000 or more the deposit cannot exceed 5% (section 30(4)(d)(ii)). |
| Layout and setting out | Agree the layout, starting lines, trims and feature tiles before work starts. Changes after setting out are variations. |
| Levelling and preparation extras | Levelling compound, removal of old tiles and extra preparation are where tiling quotes grow. Price them as allowances or rates, and on jobs of $20,000 or more put "Estimate Only" or "This Price May Change" beside any amount that may change (section 29(6)). |
| Movement joints, grout and sealing | Say what is included and what maintenance the owner must do, so that a later crack is measured against the agreed work. |
| Other trades and curing | Plumbers, glaziers and cabinet makers follow the tiler. The terms should deal with damage to finished tiling and access during curing. |
| Variations | A domestic building work contract includes its variations (section 3), so on a section 28 contract a variation should be written, priced and signed. |
| Workmanship warranty | A written warranty against defects given to a consumer must comply with regulation 90 of the Competition and Consumer Regulations 2010 (section 102). It adds to the statutory warranties; it cannot cut them down (section 42). |
| Licence details | On homeowner contracts of $20,000 or more, the licensed name and licence number must appear in the contract (section 28(1)(c)). |
What decides a tiling dispute?
Whose layer failed. Drummy or cracked tiles can come from the substrate, the adhesive coverage, missing movement joints or movement in the structure. Leaks can come from the membrane, the plumbing or the grout. The tiler’s inspection record, photographs of the substrate and membrane before tiling, and the contract’s allocation of the waterproofing are the evidence that sorts it out.
The warranties. On a homeowner job, the tiling must be done in a proper manner to accepted trade standards, the materials the tiler supplies must be good and proper, and if the owner made known the purpose of the work and relied on the tiler’s skill, the work must be reasonably fit for it (section 32(2)(a), (b), (f)). The warranties cannot be excluded (section 42), and the owner has five years from completion to sue (section 32(5)).
Owner-supplied tiles. Shade variation, chips and warping in tiles the owner bought are not within the tiler’s materials warranty (section 32(2)(b)), but laying visibly faulty tiles without raising them may still be work below accepted trade standards. Inspection before laying, and written notice of problems, protect the tiler on both counts.
Builder and tiler. Where the tiler works for a builder, the owner’s claim lies against the builder; on a reading of sections 3 and 32, the warranties are implied in the head contract, not the subcontract. The builder’s claim against the tiler depends on the subcontract, and the Magistrates Court can join subcontract disputes to the owner’s claim (section 37(4)).
The statutory warranties and defects guide explains each warranty and the defences.
Getting paid for tiling
- Builders and renovators. Tiling claims under a subcontract are payment claims under the Security of Payment Act if they identify the work, state the amount and say they are made under the Act (section 13(2)). Without a payment schedule within the contract time or 15 business days, whichever expires earlier, the claimed amount becomes payable (section 14(4)). A clause making payment depend on the builder being paid has no effect (section 12).
- Homeowners, $20,000 or more. A deposit of not more than 5%, then progress payments only for work already performed, requested in writing (section 30). The deposits and progress payments guide explains the limits.
- Homeowners, under $20,000. The terms decide, for example a deposit for special-order tiles and payment on completion.
- Retention. Retention held by a builder and due for release can be included in a payment claim (section 13(3)(b)).
What the tiler pack holds
A tiler pack is built from our masters and a tiling trade schedule, and quoted as a fixed fee before we start.
- A small job agreement for homeowner tiling under $20,000, and a domestic building work contract with Form 1 for larger jobs.
- A tiling subcontract for builders and renovators, with substrate handover, waterproofing allocation, retention and defects terms.
- Commercial terms for commercial tiling.
- A substrate inspection record, a written advice form and a variation form.
- A tiling trade schedule: scope wording for wet areas, floors and splashbacks, owner-supplied tile terms, wastage and preparation allowances, and warranty wording.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
A $12,000 bathroom retile in which the tiler also waterproofs. The job is minor domestic building work, so section 28 and Form 1 do not apply, but the statutory warranties do. If the owner made known the result wanted, a watertight shower, and relied on the tiler’s skill, the work is warranted reasonably fit to achieve it (section 32(2)(f)). The tiler’s photographs of the membrane before tiling, and its record of curing time, are what a later leak claim will be decided on.
Tiling for a builder across a run of new houses. The tiler’s contract is a subcontract. Its stage claims are payment claims under the Security of Payment Act, and a clause holding payment until the builder is paid has no effect. The builder must check the tiler’s licence and its conditions before engaging it (section 47A), so the subcontract states them.
Imported tiles bought by the owner. The owner supplies tiles for a $28,000 renovation, and several boxes arrive with a different shade. The contract is a section 28 contract with Form 1. The tiles are outside the tiler’s materials warranty, and if the terms require inspection before laying and written notice of problems, the delay and extra cost fall on the owner.
How we build tiler terms and conditions
We start with the work you do: wet areas or floors, homeowner jobs or builder work, whether you waterproof, and who supplies the tiles.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licence, job mix, waterproofing practice and tile supply | We map each job type against your licence, the $20,000 line and the Security of Payment Act |
| 2. Review | Your quotes, terms and the subcontracts builders send you | We mark the gaps on substrates, waterproofing, owner-supplied tiles and payment |
| 3. Drafting | Masters and the tiling trade schedule | We draft for your work and your licence conditions |
| 4. Delivery | Word documents, a substrate inspection record and forms | We explain written advice, variations and payment claims for your office |
We cannot promise that terms prevent every dispute. Terms that record the substrate and the waterproofing give you the evidence a tiling dispute turns on.
Before your next wet area job. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Do tilers need a builders licence in SA?
Yes, if they carry on business tiling for others. Tiling alters or improves a building, so it is building work (section 3), and section 6(1) requires a building work contractors licence. The licence may be limited to tiling or to subcontract work for licensed builders.
Is a tiler responsible for waterproofing?
If the tiler applies the membrane, yes: the waterproofing is part of its work, and on a homeowner job the statutory warranties attach to it. If a separate waterproofer does it, the tiler’s terms should say so, require a membrane handover before tiling, and record that the tiler relies on that membrane.
Who is responsible for drummy or cracked tiles?
It depends on the cause: the substrate, the adhesive coverage, the movement joints or movement in the building. On a homeowner job, the tiler warrants proper work to accepted trade standards (section 32(2)(a)); the substrate inspection record and written advice decide how far that reaches.
What if the owner supplies the tiles?
The statutory warranty about materials covers materials the contractor supplies (section 32(2)(b)), so defects in the owner’s tiles are not within it. The terms should require inspection before laying, written notice of problems, and set who pays for breakage, shortfall and delay.
Does a bathroom tiling job over $20,000 need Form 1?
Yes, if it is for a homeowner. Domestic building work costing the owner $20,000 or more needs a written contract setting out all its terms, with the licence details, signed by both parties and given to the owner with Form 1 (section 28).
Can a tiler refuse to tile over a defective substrate?
The contract decides what the tiler must do, so the terms should give the tiler the right to stop until the substrate is fixed. Where the owner insists on going ahead, the tiler’s written advice is a defence to a warranty claim about deficiencies that result (section 32(7)).
How long is a tiler liable for defects?
On domestic building work, proceedings for breach of a statutory warranty must start within five years after the work is completed (section 32(5)), and that period cannot be extended (section 32(6)). A subcontract can set its own defects period between the builder and the tiler.
Are outdoor tiles and paving building work?
Yes. Paving is prescribed building work (regulation 4(1)(b)), and building work within the curtilage of a house is domestic building work (regulation 4(2)). Outdoor tiling for a homeowner follows the same contract rules as indoor tiling.
How do tilers get paid on a builder's job?
Under the subcontract and the Security of Payment Act. A payment claim made under the Act must be answered with a payment schedule within the contract time or 15 business days, whichever is earlier, or the claimed amount becomes payable (section 14(4)). Pay when paid clauses have no effect (section 12).
Do I need a lawyer for tiler terms and conditions?
The law does not require one, but generic terms say nothing about substrates, waterproofing or owner-supplied tiles, which is where tiling disputes start. We draft tiler terms and conditions for South Australian tiling businesses that fit your licence and the jobs you take on.
Related trade contract guides
Related guides
- Finishing trades contracts SA
- Carpenter terms and conditions SA
- Painter terms and conditions SA
- Plumber terms and conditions SA
- Bathroom renovator terms and conditions SA
- Kitchen renovator terms and conditions SA
- Trade contracts SA
- Domestic building work contracts
- Minor domestic building work under $20,000
- Building deposits and progress payments
- Statutory warranties and defects
- Builders licence SA
- Subcontractor agreements