Timber Floor Installer Terms and Conditions SA: Timber Flooring Contracts and Quotes
Timber floor installer terms and conditions in South Australia
A timber floor is laid in a day or two and lived on for decades, and every change in moisture shows in the boards. When boards cup, gap or spring underfoot, the homeowner’s first call is to the installer. A fixed timber floor is building work under the Building Work Contractors Act 1995 (SA), unlike a floating floor, so the licence, the homeowner contract rules and the statutory warranties all apply. Talon Legal drafts timber floor installer terms and conditions, timber flooring contracts and quote terms for South Australian flooring businesses. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Timber floor installer terms and conditions SA key facts
| Issue | Position for timber floor installers in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA) and Regulations 2026; Building and Construction Industry Security of Payment Act 2009 (SA); Australian Consumer Law. Current to 22 November 2026. |
| Fixed floors | Building work: altering or improving a building (section 3). |
| Floating floors | Outside the Act under contracts made on or after 1 April 2010 (regulation 5(11)); defined as boards designed to be laid over a floor without being fixed to it (regulation 5(13)). |
| Glued and nailed boards | In Treffers, Nicholson J considered that boards designed to float, but glued and nailed down, were not installed as a floating floor. |
| Licence | A building work contractors licence for a business that lays fixed floors for others (section 6(1)). |
| $20,000 or more | A written contract with Form 1 (section 28), a deposit of no more than 5% (section 30(4)) and cooling-off (section 36). |
| Warranties | Proper work to accepted trade standards and good and proper materials (section 32(2)(a), (b)); five years to sue (section 32(5)). |
| Owner's instructions | A deficiency from instructions the owner insisted on against the installer's written advice is a defence (section 32(7)). |
| The contracting party | The party the documents objectively show; in Treffers, the company named with its ACN and ABN on the quote, agreement and invoice. |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need timber floor installer terms and conditions? What this guide covers
This guide covers what is particular to timber floor installer terms and conditions in South Australia, current to 22 November 2026: when a timber floor is building work, what a timber flooring quote should state, moisture and cupping, work over existing floors, whose name goes on the documents, homeowner contracts either side of $20,000 and flooring for builders. Floating floors are covered in the floating floor installer guide, and the rules shared with other finishing trades in the finishing trades contracts SA guide.
We act for timber floor installers, flooring companies that supply and install solid and engineered boards, and flooring contractors who work for builders.
Free Consultation. Send us the quote and terms you use now, or the complaint a client has made. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Is a timber floor building work?
- What a timber flooring quote should state
- Moisture, cupping and gaps
- Working over existing floors
- Whose name is on the quote?
- Homeowner contracts either side of $20,000
- Flooring for builders
- What the timber flooring pack holds
- How similar matters tend to play out
- Timber flooring case law
- How we build timber floor installer terms and conditions
- Frequently asked questions
- Related trade contract guides
Is a timber floor building work?
A fixed timber floor is. Laying boards nailed to joists or battens, or glued and nailed to a slab or an existing floor, alters or improves a building, which is building work (section 3). A business that does it for others needs a building work contractors licence (section 6(1)).
Floating floors are different. The Act does not apply to the installation, maintenance, repair or removal of a floating floor under a contract entered into on or after 1 April 2010 (regulation 5(11)). A floating floor is “a floor covering comprised of boards designed to be laid over a floor without being fixed to the floor” (regulation 5(13)).
The definition speaks of boards designed to float, which leaves the method of installation in play. In Treffers, the boards were designed as floating floorboards but were glued to the substrate and secret nailed ([100]). Nicholson J considered that the definition embraces both the design and an installation to match it, so that a failure to install the boards as a floating floor brought the work within the Act ([103], [106]). Those reasons were not necessary to the result of the appeal, which turned on who the contracting party was.
For a flooring business, the method decides which law applies:
| How the boards are laid | Position under the Act |
|---|---|
| Solid boards nailed to joists or battens | Building work (section 3) |
| Boards glued and nailed to a slab or an existing floor | Building work (section 3) |
| Click-together boards laid loose over underlay, under a contract made on or after 1 April 2010 | Outside the Act (regulation 5(11)) |
| Boards designed to float but glued or nailed down | On the view taken in Treffers, inside the Act |
What a timber flooring quote should state
The quote is where a timber flooring dispute is won or lost, because it records what the installer agreed to lay and over what.
| Item | What it settles |
|---|---|
| The boards | Species, grade, width and thickness, and solid or engineered |
| The method | Nailed to joists, secret nailed, direct stick, over battens or over ply |
| The subfloor | Slab, joists, existing boards or ply, and the preparation included |
| Moisture | Readings to be taken of the slab or subfloor and the boards before laying, recorded on the job sheet |
| Acclimatisation | How long the boards sit on site before laying, and who provides the conditions |
| Expansion gaps | That gaps are left at walls and fixed objects, and how they are covered |
| Finish | The coating system, the number of coats and the sheen |
| Exclusions | Moisture from leaks, rising damp or plumbing, and subfloor defects found once work starts |
A variation is part of the contract (section 3). Adding the hallway and the stairs to a living room floor can take the price over $20,000, and the contract then has to meet Division 1.
Moisture, cupping and gaps
Timber takes up and gives off moisture. Boards that take up moisture from below cup; boards that dry out after laying shrink and gap. The question in a dispute is whether the cause was the installer’s work, the boards supplied or conditions in the house.
The statutory warranties answer part of it. The work must be performed in a proper manner to accepted trade standards, and materials the installer supplies must be good and proper (section 32(2)(a), (b)). In Treffers, Nicholson J said the Magistrate was correct to find that standard breached in several ways, including by failing to remove Black Japan from the existing pine floor, failing to install a ply breaker between the pine and the new boards, using line gluing, not using polyurethane flooring adhesive and not leaving expansion gaps ([146]).
The terms do the rest:
- Readings on file. Moisture readings of the subfloor and the boards before laying, recorded on a job sheet signed by the client.
- Conditions in the house. The client’s part: no wet mopping, ventilation of the subfloor, and keeping heating and cooling within the range stated at handover.
- Written warnings. A written warning where the subfloor reading is above the level the installer is prepared to lay over, and the client’s signed decision to proceed or wait.
- The warranty period. Proceedings on a statutory warranty must be brought within five years after completion of the work (section 32(5)).
Working over existing floors
Laying over old boards or sanding them back raises a risk new work does not: the condition of a floor nobody has seen underneath. Thin boards, old nails, borer and earlier coatings all appear once work starts.
In Adelaide Timber Floor, a flooring company said it had warned at the quote that the existing boards were thin, that the problems proved worse once work began, and that the owner told it to continue; the owner said the boards had been sanded beyond repair and were unsafe ([26], [27]). The Court found clear disputes about the scope of the work, the owner’s instructions and the workmanship ([43]).
It is a defence to a warranty claim that the deficiency arose from instructions the owner insisted on contrary to the contractor’s written advice (section 32(7)). The advice has to be in writing, and a note on a job sheet signed by the owner before the sanding continues is the record that counts.
When a client says the floor has failed. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Whose name is on the quote?
A flooring business that trades through a company should put the company on every document. In Treffers, the owner sued both the company and the man who signed the agreement, and the Magistrate found that he, not the company, was the contracting party ([7]). On appeal, Nicholson J found that, objectively, the owner and the company had contracted, because the company’s ACN, ABN and address were on the Minor Works Agreement, the quote and the tax invoice ([85]). The appeal was allowed and the claim against the man dismissed ([176]).
The documents should show:
- The entity. The company’s full name, ACN and ABN on the quote, the contract, every variation and every invoice.
- The signature. The person who signs, signing for and on behalf of the company, with their position.
- The licence. The licence held by the same company, with its number on any contract that needs it (sections 6(1), 28).
Homeowner contracts either side of $20,000
A fixed timber floor laid at a house for its owner is domestic building work.
| Homeowner job | What applies |
|---|---|
| Under $20,000 | Minor domestic building work: the statutory warranties apply; the Division 1 rules do not (section 27(2); regulation 4(4)) |
| $20,000 or more | A written contract with all its terms, the licensed name and number, signatures and Form 1 (section 28); a deposit of no more than 5% and progress payments only for work already performed (section 30(1), (4)); five clear business days to cool off (section 36) |
| Supply of boards | Boards ordered for the job are part of the price; the payment terms should match the deposit limit |
A term that excludes the statutory warranties is void (section 42), so the protection comes from describing the job precisely.
Flooring for builders
Laying floors for a builder is a subcontract, not a domestic building work contract (section 3). Under the Security of Payment Act, construction work includes the construction and alteration of buildings (section 5(1)(a)), and a flooring subcontractor can serve a payment claim that identifies the work, states the amount and says it is made under the Act (section 13(2)). A builder that gives no payment schedule within the time in the subcontract, or 15 business days if earlier, becomes liable for the claimed amount (section 14(4)), and a pay when paid clause has no effect (section 12).
What the timber flooring pack holds
A timber flooring pack is built from our masters and a timber flooring schedule, and quoted as a fixed fee before we start.
- Homeowner terms for jobs under $20,000 and a domestic building work contract with Form 1 for larger jobs.
- A quote template that records the boards, method, subfloor, moisture readings and finish.
- A job sheet for moisture readings and written warnings, signed by the client before laying or sanding.
- Care instructions given at handover, with the client’s acknowledgement.
- A subcontract with payment claim and schedule procedures for work for builders.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
The slab that was not dry. An installer measures the moisture in a new slab and records a reading above the level it is prepared to lay over. The client wants the floor down before a family event and signs the job sheet instructing the installer to proceed. When the boards cup, the signed instruction against written advice is the installer’s answer under section 32(7).
The engineered boards glued down. A client buys click-together engineered boards and asks for them to be glued to the slab for a solid feel. On the view taken in Treffers, that floor is inside the Act, so the $20,000 rules and the warranties apply to the job.
The quote in the wrong name. A flooring company’s quotes go out under the director’s own name and mobile number. The terms are redrafted so that every quote, contract and invoice names the company with its ACN and ABN.
Timber flooring case law
None of the decisions below set out a standard form for timber flooring contracts. Each turned on a dispute a flooring business can face.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Treffers v Phung [2020] SASC 228 | Supreme Court | The company named on the quote, agreement and invoice was the contracting party; boards designed to float but glued and nailed were considered not to be a floating floor | [6], [7], [85], [100] to [106], [146], [176] |
| Adelaide Timber Floor Pty Ltd v Pullin [2020] SADC 158 | District Court | A default judgment for the cost of floor repairs was set aside where the claim was not liquidated and the scope, instructions and workmanship were in dispute | [1], [2], [26], [27], [31], [32], [43], [48] |
Case notes
Treffers v Phung [2020] SASC 228
A homeowner accepted a quote of $36,336.30 for select grade Spotted Gum boards, “both adhered and secret nailed”, through downstairs and upstairs areas and a stairway, and a Minor Works Agreement was signed ([6]). The Magistrate found the man who signed the agreement was the contracting party, found breaches of the warranty in section 32(2)(a) and awarded $80,000 ([7]). Nicholson J allowed the appeal on that issue: objectively the owner and the company contracted, the company’s ACN, ABN and address appearing on the agreement, the quote and the invoice ([11], [85]). In reasons not necessary to the result, his Honour considered that boards designed to float but glued and nailed were not installed as a floating floor, bringing the work within the Building Work Contractors Act ([100], [104], [106]), and said the Magistrate was correct to find the warranty breached in the ways listed at [146]. The orders against the appellant were set aside and the claim against him dismissed ([176]).
Adelaide Timber Floor Pty Ltd v Pullin [2020] SADC 158
A homeowner obtained a default judgment of $11,500 against a flooring company over flooring works at her home after the company missed the time for its defence ([1], [2]). The company said it had warned at the quote that the existing boards were thin and that the owner told it to continue; the owner said the boards were sanded beyond repair ([26], [27]). Judge Deuter found the judgment irregular because the claim, for the cost of repairs not yet done, was not a liquidated sum ([31], [32]), found clear disputes on the scope of the work, the owner’s instructions and the workmanship ([43]), set the judgment aside and remitted the action to the Magistrates Court ([48]).
How we build timber floor installer terms and conditions
We start with what you lay and who you lay it for: solid or engineered boards, new homes or renovations, homeowners or builders.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licence, structure, products, methods and clients | We sort your jobs into fixed and floating work, minor work, Division 1 contracts and subcontracts |
| 2. Review | Your quotes, job sheets, care instructions and any complaints | We mark the method, moisture and entity terms that leave you exposed |
| 3. Drafting | Masters and the timber flooring schedule | We draft homeowner terms, a contract for larger jobs, the job sheet and a subcontract |
| 4. Delivery | Word documents ready for quoting | We brief you on moisture records, written warnings and variations |
We cannot promise that terms prevent every dispute. A quote that records the method and the moisture readings, in the company’s name, answers the questions a cupped floor raises.
Before your next flooring quote goes out. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Is a timber flooring contract template enough in SA?
Not on its own. A template written for floating floors or for another state can miss that a fixed timber floor is building work, with a licence number and Form 1 needed on homeowner contracts of $20,000 or more, a 5% deposit limit and warranties that cannot be excluded (Building Work Contractors Act sections 28, 30, 42). It also says nothing about the method or moisture readings.
Are timber floors building work in SA?
Fixed timber floors are, because laying them alters or improves a building (Building Work Contractors Act section 3). Floating floors under contracts made on or after 1 April 2010 are outside the Act (regulation 5(11)).
Is a glued and nailed floor a floating floor?
In Treffers, Nicholson J considered that boards designed to float but glued and secret nailed were not installed as a floating floor, so the work was inside the Act. The reasons were not necessary to the result of that appeal.
Who is the contracting party on a flooring quote?
The party the documents objectively show. In Treffers, the company’s ACN, ABN and address on the quote, agreement and invoice made the company the contracting party, not the man who signed.
Who pays when a timber floor cups?
It depends on the cause. The warranties cover the installer’s work and the boards it supplies (Building Work Contractors Act section 32(2)(a), (b)); moisture from leaks or conditions in the house is a different question, and the readings on file decide much of it.
Can a flooring business rely on the owner's instructions?
It is a defence to a warranty claim that a deficiency arose from instructions the owner insisted on contrary to the contractor’s written advice (Building Work Contractors Act section 32(7)). The advice must be in writing.
How much deposit can a timber floor installer take?
On a homeowner contract of $20,000 or more, no more than 5% of the price, with later payments only for work already performed (Building Work Contractors Act section 30(1), (4)).
What if the client says the old boards were sanded too thin?
That turns on what was agreed and what the client was told. In Adelaide Timber Floor, the company said it had warned that the boards were thin and was told to continue; the Court found the scope, the instructions and the workmanship in dispute.
How long is a timber floor installer liable for defects?
Proceedings on a statutory warranty must be brought within five years after completion of the work (Building Work Contractors Act section 32(5)).
Do I need a lawyer for timber floor installer terms and conditions?
The law does not require one, but a flooring contract has to fit the fixed and floating rules, the homeowner contract rules and the warranties. We draft timber floor installer terms and conditions for South Australian flooring businesses that put the method and the moisture on paper.
Related trade contract guides
Related guides
- Finishing trades contracts SA
- Floating floor installer terms and conditions SA
- Carpet layer terms and conditions SA
- Carpenter terms and conditions SA
- Tiler terms and conditions SA
- Renovation builder terms and conditions SA
- Domestic building work contracts
- Minor domestic building work under $20,000
- Statutory warranties and defects
- Builders licence SA
- Trade contracts SA