Cool Room Builder Terms and Conditions SA: Contracts for Cool Rooms and Freezer Rooms
Cool room builder terms and conditions in South Australia
A cool room is two jobs in one: an insulated room that has to be built, and a refrigeration system that has to hold a temperature the client’s stock depends on. Each half has its own licence. A room that will not hold temperature can put both halves in issue. Talon Legal drafts cool room builder terms and conditions, temperature specifications and commissioning terms for South Australian cool room and freezer room builders. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Cool room builder terms and conditions SA key facts
| Issue | Position for cool room builders in South Australia |
|---|---|
| Governing law | Building Work Contractors Act 1995 (SA); Ozone Protection and Synthetic Greenhouse Gas Management Regulations 1995 (Cth); Australian Consumer Law. Current to 21 November 2026. |
| The room | On a reading of section 3, building a cool room in or onto a building alters or adds to it, which is building work needing a building work contractors licence (section 6(1)). |
| The refrigeration | Installing, commissioning, servicing and maintaining refrigeration equipment is work in relation to RAC equipment, which needs a refrigerant handling licence (regulation 111(1), (2)). |
| Penalties | A strict liability offence of 50 penalty units and a civil penalty of 60 penalty units (regulation 111(3), (4)). |
| Consumer guarantees | Services must be reasonably fit for a purpose made known to the supplier, and so must any product resulting from them (Australian Consumer Law section 61(1)). |
| Business clients | For goods or services not of a kind ordinarily acquired for personal, domestic or household use, liability can be limited to repair, replacement or supplying the services again (section 64A(1), (2)). |
| First step | Same-day free 30-minute consultation. Call (08) 7094 2021. |
Need cool room builder terms and conditions? What this guide covers
This guide covers what is particular to cool room builder terms and conditions in South Australia, current to 21 November 2026: the building licence and the refrigerant licence, the temperature specification, commissioning and handover, liability limits for business clients, and getting paid. The rules shared by every builder are in the builder contracts SA guide.
We act for cool room and freezer room builders, refrigeration contractors and panel installers.
Free Consultation. Send us your quote, your warranty terms or a room that will not hold temperature. Book a same-day free 30-minute consultation or call (08) 7094 2021.
On this page
- Two licences: the room and the refrigeration
- The temperature specification
- Commissioning and handover
- Liability limits for business clients
- Getting paid on a cool room
- What the cool room pack holds
- How similar matters tend to play out
- Cool room case law
- How we build cool room builder terms and conditions
- Frequently asked questions
- Related trade contract guides
Two licences: the room and the refrigeration
| Part of the job | Licence | Source |
|---|---|---|
| Panels, floor, door and the structure the room sits in or on | Building work contractors licence, on a reading of section 3 | Building Work Contractors Act section 6(1) |
| Installing and commissioning the refrigeration system | Refrigerant handling licence, unless a listed exception applies | Commonwealth regulation 111(1), (2) |
| Servicing and maintaining it after handover | Refrigerant handling licence | Regulation 111(2) |
| Wiring the refrigeration unit and lighting | Electrical contractor licence and registered electrical worker | Plumbers, Gas Fitters and Electricians Act sections 6(1), 13 |
The Commonwealth definition is wide. Work in relation to RAC equipment includes “manufacturing, installing, commissioning, servicing and maintaining RAC equipment, whether or not refrigerant is present” (regulation 111(2)). A full refrigeration and air conditioning licence authorises handling a refrigerant for any work in the refrigeration and air conditioning industry other than the automotive industry (Table 131, item 1).
A builder can engage a licensed refrigeration contractor for that part of the job. A builder is exempt from the plumbing, gas fitting and electrical contractor licence on condition that the electrical work is performed in the ordinary course of the business by a person licensed or registered for it (Plumbers, Gas Fitters and Electricians Regulations regulation 4(1)). The contract should name who holds each licence for each part of the job.
The building licence matters to the money. An unlicensed contractor is not entitled to any fee, other consideration or compensation under or in relation to the contract unless a court is satisfied the failure resulted from inadvertence only (section 6(2)). The interstate builder in Allied Grain, below, had to prove exactly that.
The temperature specification
The temperature the room must hold is the term every later dispute is measured against. The specification should state:
- The duty. The target temperature range, the maximum stock load, and how much warm product goes in each day.
- The conditions. The ambient temperature and location the system was designed for, and how often the door is expected to open.
- The client’s part. Door discipline, strip curtains, clear airflow around the evaporator, and not loading above the design weight.
- The test. How the temperature will be measured, where, for how long, and what counts as a pass.
The consumer guarantees reach many cool rooms. Services must be reasonably fit for a purpose the consumer makes known, and so must any product resulting from the services (Australian Consumer Law section 61(1)), unless the consumer did not rely, or it was unreasonable to rely, on the supplier’s skill or judgment (section 61(3)). Services costing $100,000 or less are acquired as a consumer whoever acquires them (section 3(3)(a); Competition and Consumer Regulations regulation 77A), so a business client buying a cool room at or under that amount can be a consumer.
Commissioning and handover
Commissioning is where the two halves of the job meet. The terms should say:
- the room is complete when the building work is finished and the system has passed the agreed test, not when the panels are up;
- who records the commissioning results and gives the client a copy;
- what the client must do before stock goes in, including running the room empty for a set period;
- that warranty claims need the service records, and who may service the system without voiding the warranty.
Where the client loads stock before commissioning is finished, the contract should say who bears the risk.
Liability limits for business clients
A term that purports to exclude, restrict or modify the consumer guarantees is void to that extent (Australian Consumer Law section 64(1)). Business clients are treated differently:
| Supply | What the limit can be | Source |
|---|---|---|
| Goods not of a kind ordinarily acquired for personal, domestic or household use | Replacement or equivalent goods, repair, or the cost of either | Section 64A(1) |
| Services not of that kind | Supplying the services again, or the cost of having them supplied again | Section 64A(2) |
| Either, where the client shows reliance on the limit is not fair or reasonable | No limit | Section 64A(3) |
On a reading of section 64A, a cool room for a shop, restaurant or warehouse is not of a kind ordinarily acquired for household use. A cool room at a house may be. The factors a court weighs include the parties’ bargaining strength and whether the client knew of the term (section 64A(4)). The limit should be clear, prominent and explained when the quote is accepted.
Stock loss is the claim that follows a failed room. The contract should deal with it expressly, within what sections 64 and 64A allow. It should not promise a temperature the system was not designed to hold.
Getting paid on a cool room
- Commercial work. A cool room in a shop, restaurant or warehouse is not domestic building work, so Part 5 does not apply. The Building and Construction Industry Security of Payment Act 2009 (SA) applies to construction work. That includes the construction of structures forming part of land (section 5(1)(a)).
- Materials. Under the Security of Payment Act, materials and components are valued only if they have become, or on payment will become, the property of the party for whom the work is done (section 10).
- Domestic work. A cool room at a house is domestic building work, so a contract of $20,000 or more needs a written contract with Form 1, a deposit of no more than 5% and progress payments only for work already performed (sections 28, 30).
- Retention of title. Once panels and equipment are affixed to land, the Personal Property Securities Act does not apply to an interest in the fixture (section 8(1)(j)), so retention of title protects goods only until they are installed.
What the cool room pack holds
A cool room pack is built from our masters and a cool room schedule, and quoted as a fixed fee before we start.
- Cool room terms that split the building work and the refrigeration work and name the licence holder for each.
- A temperature specification with the design duty, the client’s obligations and the commissioning test.
- A commissioning record and handover form.
- A limitation of liability clause drafted to section 64A for business clients.
- Service and warranty terms for after handover.
How similar matters tend to play out
These are illustrations built from the rules above, not predictions. Every job turns on its own contract and facts.
The room that warmed every afternoon. A florist’s room drifts above temperature on hot afternoons. The specification recorded a design ambient temperature and a daily load, and the florist had doubled the load. The dispute turns on the specification, not on general impressions of whether the room works.
The unlicensed refrigeration subcontractor. A builder lets a mechanic without a refrigerant handling licence connect the system. The connection is work in relation to RAC equipment (regulation 111(2)), and the builder’s terms required the licence number of whoever did it.
The freezer that did not match the order. A freezer room is delivered with a smaller door and thinner panels than the quote. As in Adelaide Marble, a supplier that does not supply in accordance with the contract, and will not replace, can face damages measured by the replacement cost.
Cool room case law
None of the decisions below concerned a cool room. Each decides a rule a cool room contract runs into.
| Case | Court | Principle | Pinpoint |
|---|---|---|---|
| Allied Grain Systems Pty Ltd v Inheritance Capital Asset Management Pty Ltd [2023] SASC 175 | Supreme Court | Ignorance of the obligation to be licensed can be inadvertence under section 6(2)(b), absent wilful failure to inquire or reckless indifference | [5], [38], [39], [41] |
| Adelaide Marble Specialists Pty Ltd v Ragunath [2023] SASC 139 | Supreme Court | A supplier that did not supply in accordance with the contract, and refused to replace, was liable for damages measured by the replacement cost | [2], [5], [12], [19], [75] |
Case notes
Allied Grain Systems Pty Ltd v Inheritance Capital Asset Management Pty Ltd [2023] SASC 175
An interstate company carried out building work in South Australia without a licence and claimed $1,139,121.59 under the contract ([5]). The Court accepted that it would have obtained a licence had it known of the obligation ([38]). Stanley J held that the inadvertence exception in section 6(2)(b) is met where the failure is due to ignorance of the obligation to be licensed, unless there was a wilful failure to make inquiries or reckless indifference ([39]). He found the company’s failure resulted from inadvertence only ([41]).
Adelaide Marble Specialists Pty Ltd v Ragunath [2023] SASC 139
A company accepted the owners’ order to supply and install kitchen and pantry bench tops and splashbacks through signed order forms and its general terms ([2]). Quality and whether the edges matched the contract were disputed, and the work was not finished ([5]). The trial court found the company breached the contract by not supplying bench tops in accordance with it. It also found that the owners ended the contract when the company refused to replace them, and that the loss was the replacement cost ([12]). Damages were $15,230.87 ([19]), and Kimber J dismissed the appeal ([75]).
How we build cool room builder terms and conditions
We start with how you build and commission rooms, and who holds which licence.
| Stage | What happens | What we do |
|---|---|---|
| 1. Intake | A questionnaire on your licences, your refrigeration contractors, your clients and your warranty terms | We map each part of the job to the licence and the terms it needs |
| 2. Review | Your quotes, specifications, commissioning sheets and warranty documents | We mark limits that go further than section 64A allows and specifications that leave the duty unstated |
| 3. Drafting | Masters and the cool room schedule | We draft your terms, temperature specification, commissioning record and liability clause |
| 4. Delivery | Word documents and a commissioning checklist | We brief you and your installers on commissioning, records and warranty claims |
We cannot promise that terms prevent every dispute. Terms that match how you design, build and commission rooms decide most of them before they start.
Before your next cool room quote goes out. Book a same-day free 30-minute consultation or call (08) 7094 2021.
Frequently asked questions
Does a cool room builder need a builders licence in SA?
On a reading of section 3, building a cool room in or onto a building is building work, so the business needs a building work contractors licence (section 6(1)). The refrigeration work needs a refrigerant handling licence as well.
Who needs a refrigerant handling licence for a cool room?
Anyone who installs, commissions, services or maintains the refrigeration equipment, unless a listed exception applies (Commonwealth regulation 111(1), (2)), whether or not refrigerant is present at the time.
What is the penalty for refrigeration work without a licence?
A strict liability offence of 50 penalty units and a civil penalty of 60 penalty units (regulation 111(3), (4)).
Can I limit my liability to a business client for a cool room?
For goods or services not of a kind ordinarily acquired for personal, domestic or household use, liability can be limited to repair, replacement or supplying the services again, unless the client shows reliance on the limit is not fair or reasonable (Australian Consumer Law section 64A).
Are business clients protected by the consumer guarantees?
They can be. Services costing $100,000 or less are acquired as a consumer whoever buys them (section 3(3)(a); regulation 77A), and a term that purports to exclude the guarantees is void to that extent (section 64(1)).
What should a cool room temperature specification include?
The target range, the stock load, the daily warm product, the design ambient temperature, the client’s obligations and the test that proves the room holds temperature.
Who is responsible if the client overloads the cool room?
The specification decides it. Where the contract records the design load and the client’s obligations, a room overloaded beyond that design is measured against the specification the client accepted.
Does the Security of Payment Act apply to commercial cool rooms?
Yes, where the work is construction work under a construction contract. Construction work includes the construction of structures forming part of land (section 5(1)(a)).
Does retention of title protect cool room panels?
Only until they are installed. The Personal Property Securities Act does not apply to an interest in a fixture (section 8(1)(j)), and fixtures are goods affixed to land (section 10).
Do I need a lawyer for cool room builder terms and conditions?
The law does not require one, but a cool room joins building work, refrigeration and stock loss in one contract. We draft cool room builder terms and conditions for South Australian builders that keep the halves of the job clear.
Related trade contract guides
Related guides
- Builder contracts SA
- Commercial builder terms and conditions SA
- Industrial builder terms and conditions SA
- Shopfitter terms and conditions SA
- Building maintenance contractor terms and conditions SA
- Electrician terms and conditions SA
- Builders licence SA
- Trade contracts SA
- Terms of trade and retention of title
- Subcontractor agreements